BP Unit
SiBE18-821_C
458
Removal Procedure
4
Remove the sealing
materials of the pipe
insulation sleeves.
5
Remove the putty.
BPMKS967B2B model does
not have an electronic
expansion valve for room C.
6
Cut off the clamps and
pull out the electronic
expansion valve coils.
Step
Procedure
Points
Sealing material
(R12994)
(Q0513)
(R12993)
Electronic
expansion
valve coils
for room A
for room B
for room C
(Q0528)
Clamp