![background image](http://html1.mh-extra.com/html/daikin/super-multi-plus-e-series-ftxg25ev1bw/super-multi-plus-e-series-ftxg25ev1bw_service-manual_4705813459.webp)
SiBE18-821_C
Outdoor Unit
Removal Procedure
447
3
Disconnect the lead
wires of the high
pressure switch.
4
Remove the screw and
remove the solenoid
valve coil for hot gas
bypass.
5
Remove the screw and
remove the solenoid
valve coil for unloading.
Step
Procedure
Points
High pressure switch (S1PH)
(R12978)
(R12979)
Solenoid valve coil for
hot gas bypass (Y2S)
Solenoid valve coil for unloading (Y3S)
(R12980)