![background image](http://html1.mh-extra.com/html/daikin/super-multi-plus-e-series-ftxg25ev1bw/super-multi-plus-e-series-ftxg25ev1bw_service-manual_4705813106.webp)
Other Control
SiBE18-821_C
94
Function
5. Other Control
5.1
Demand Control
In order to save the power consumption, the capacity of outdoor unit is saved with control
forcibly by using “Demand 1 Setting”.
To operate the unit with this mode, additional setting of “Continuous Demand Setting”.
[Demand 1 setting]
★
Other protection control functions have precedence over the above operation.
5.2
Heating Operation Prohibition Control
Heating operation is prohibited when the outdoor temperature is above 24°CDB.
Setting
Standard for upper limit of power consumption
Demand 1 setting 1
Approx. 60%
Demand 1 setting 2 (factory setting)
Approx. 70%
Demand 1 setting 3
Approx. 80%