![background image](http://html1.mh-extra.com/html/daikin/super-multi-plus-e-series-ftxg25ev1bw/super-multi-plus-e-series-ftxg25ev1bw_service-manual_4705813448.webp)
Outdoor Unit
SiBE18-821_C
436
Removal Procedure
1.2
Removal of PCBs / Electrical Components
Procedure
Warning
Be sure to commence the disassembling work after 10 minutes or
more elapsed from all power supplies have been turned off.
Step
Procedure
Points
1
Remove the 2 screws
of the terminal
mounting plate.
Preparation
Remove the outer panels
according to the “Removal of
Outer Panels”.
M5(3) × 12
2
Remove the screw
above the electrical
component assembly.
M5(3) × 12
3
Unfasten the clamp
from the terminal
mounting plate.
(R12966)
Terminal mounting plate
(R9220)
(R9221)