background image

9

English

Pump Down Operation

In order to protect the environment, be sure to pump down when relocating or disposing of the unit.

1) Remove the valve cap from liquid stop valve and gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop forced cooling operation.

Forced cooling operation

Using the indoor unit ON/OFF switch 

Press the indoor unit ON/OFF switch for at least 5 seconds. (Operation will start.)
• Forced cooling operation will stop automatically after around 15 minutes. 

To force a trial operation to stop, press the indoor unit ON/OFF switch.

Using the indoor unit’s remote controller

1) Press “MODE” button and select the cooling mode.
2) Press “ON/OFF” button to turn on the system.
3) Press both of “TEMP” button and “MODE” button at the same time.
4) Press “MODE” button twice. (

 will be displayed and the unit will enter trial 

operation.)

• Trial operation will stop automatically after around 30 minutes. To stop trial 

operation, press “ON/OFF” button.

Using the outdoor unit forced cooling operation switch (with standby 
electricity saving function turned off)

Push on “

” (SW1) with a screwdriver. (Operation will start.)

• Forced cooling operation will stop automatically after around 15 minutes.

To force a trial operation to stop, press the forced operation switch (SW1).

 CAUTION

• When pressing the switch, do not touch the terminal block. It has a high voltage, so doing so may cause electric shock.
• After closing the liquid stop valve, close the gas stop valve within 3 minutes, then stop the forced operation.

Gas 
stop valve

Valve cap

Hexagonal 
wrench

Close

Liquid 
stop valve

Service port

1

2

3

The selective connector for standby electricity 
saving in use (with standby electricity saving 
function turned off)

Push here

Screwdriver

Power supply
terminal block

01_EN_3P254362-3E.fm  Page 9  Tuesday, December 7, 2010  7:32 PM

Summary of Contents for RXG25K2V1B

Page 1: ...t series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instalaci n Serie Spl...

Page 2: ...DUSTRIES LTD Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64564 15G RXG25K2V1B RXG35K2V1B Shinri Sada Manager Quality Control Department DAIKIN TCF 015 N9 01 2011 KEMA Quality B...

Page 3: ...Center Bldg 2 4 12 Nakazaki Nishi Kita ku Osaka 530 8323 Japan RXG25K2V1B RXG35K2V1B 3SB64417 13L Shinri Sada Manager Quality Control Department 3SB64417 13L fm Page 1 Wednesday February 16 2011 10 3...

Page 4: ...3SB64417 13L fm Page 2 Wednesday February 16 2011 10 38 AM...

Page 5: ...ls If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant comes into contact with fire After completing installation check for refrige...

Page 6: ...8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place under the unit a...

Page 7: ...necting the FVXG indoor unit the shortest piping length should be no less than around 2 5m 1 5m Min allowable length CAUTION Set the piping length from 1 5m to 20m Wrap the insulation pipe with the fi...

Page 8: ...door Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necess...

Page 9: ...hes when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the...

Page 10: ...p valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping an...

Page 11: ...on dimensions as below 3 Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insulation O D 9 5mm O D 6 4mm...

Page 12: ...ff if has not been turned off 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn on the main power supply CAUTION Before connecting or disconnecti...

Page 13: ...the same time 4 Press MODE button twice will be displayed and the unit will enter trial operation Trial operation will stop automatically after around 30 minutes To stop trial operation press ON OFF...

Page 14: ...supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used due to unavoidable r...

Page 15: ...unt of power in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips t...

Page 16: ...1102 HT 3P254362 3E M10B207 Two dimensional bar code is a code for manufacturing 00_CV_3P254362 3E fm Page 2 Tuesday December 7 2010 7 19 PM...

Reviews: