Outdoor Unit Installation

6.

Refilling the refrigerant

Check the type of refrigerant to be used on the machine nameplate.

Precautions when adding R410A
Fill from the liquid pipe in liquid form.

It is a mixed refrigerant, so adding it in gas form may cause the refrigerant composition to change, preventing normal operation.
1) Before filling, check whether the cylinder has a siphon attached or not. (It should have something like “liquid filling siphon 

attached” displayed on it.)

• Be sure to use the R410A tools to ensure pressure and to prevent foreign objects entering.

NOTE

National implementation of EU regulation on certain fluorinated greenhouse gases may require to provide the appropriate official 
national language on the unit. Therefore an additional multilingual fluorinated greenhouse gases label is supplied with the unit. 
Sticking instructions are illustrated on the backside of that label.

7.

Refrigerant piping work

7-1 Caution on pipe handling

1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender 

for bending.

7-2 Selection of copper and heat insulation materials

When using commercial copper pipes and fittings, observe the following:
1) Insulation material:  Polyethylene foam 

Heat transfer rate:  0.041 to 0.052W/mK (0.035 to 0.045kcal/mh°C)
Refrigerant gas pipe’s surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this temperature.

2) Be sure to insulate both the gas and liquid piping and to provide insulation 

dimensions as below.

3) Use separate thermal insulation pipes for gas and liquid refrigerant pipes.

Gas side

Liquid side

Gas pipe 

thermal insulation

Liquid pipe 

thermal insulation

O.D. 9.5mm

O.D. 6.4mm

I.D. 12-15mm

I.D. 8-10mm

Minimum bend radius

Thickness 10mm Min.

30mm or more

Thickness 0.8mm (C1220T-O)

Filling a cylinder with an attached siphon

Stand the cylinder upright when 
filling.

There is a siphon pipe inside, so the 
cylinder need not be upside-down to 
fill with liquid.

Filling other cylinders

Turn the cylinder upside-down 
when filling.

3

5

6

2

1

4

Please fill in with indelible ink, 

n

1

  the factory refrigerant charge of the product, 

n

2

  the additional refrigerant amount charged in the field and

n

1  +  2

  the total refrigerant charge 

on the refrigerant charge label supplied with the product.

Important information regarding the refrigerant used

This product contains fluorinated greenhouse gases covered by 
the Kyoto Protocol. Do not vent gases into the atmosphere.

Refrigerant type:

R410A

GWP

(1)

 value:

1975

 

(1) 

GWP = global warming potential 

1

factory refrigerant charge of the 
product: 
see unit name plate 

2

additional refrigerant amount 
charged in the field 

3

total refrigerant charge 

4

Contains fluorinated greenhouse 
gases covered by the Kyoto 
Protocol

5

outdoor unit

6

refrigerant cylinder and manifold 
for charging

The filled out label must be adhered in the 
proximity of the product charging port (e.g. 
onto the inside of the stop valve cover).

Wall

If no flare cap is 
available, cover 
the flare mouth 
with tape to keep 
dirt or water out.

Be sure to 
place a cap.

Rain

Gas pipe

Liquid pipe

Gas pipe 
insulation

Liquid pipe 
insulation

Finishing tape

Drain hose

Inter-unit wire

01_EN_3P254362-3E.fm  Page 7  Tuesday, December 7, 2010  7:32 PM

Summary of Contents for RXG25K2V1B

Page 1: ...t series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instalaci n Serie Spl...

Page 2: ...DUSTRIES LTD Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64564 15G RXG25K2V1B RXG35K2V1B Shinri Sada Manager Quality Control Department DAIKIN TCF 015 N9 01 2011 KEMA Quality B...

Page 3: ...Center Bldg 2 4 12 Nakazaki Nishi Kita ku Osaka 530 8323 Japan RXG25K2V1B RXG35K2V1B 3SB64417 13L Shinri Sada Manager Quality Control Department 3SB64417 13L fm Page 1 Wednesday February 16 2011 10 3...

Page 4: ...3SB64417 13L fm Page 2 Wednesday February 16 2011 10 38 AM...

Page 5: ...ls If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant comes into contact with fire After completing installation check for refrige...

Page 6: ...8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place under the unit a...

Page 7: ...necting the FVXG indoor unit the shortest piping length should be no less than around 2 5m 1 5m Min allowable length CAUTION Set the piping length from 1 5m to 20m Wrap the insulation pipe with the fi...

Page 8: ...door Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necess...

Page 9: ...hes when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the...

Page 10: ...p valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping an...

Page 11: ...on dimensions as below 3 Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insulation O D 9 5mm O D 6 4mm...

Page 12: ...ff if has not been turned off 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn on the main power supply CAUTION Before connecting or disconnecti...

Page 13: ...the same time 4 Press MODE button twice will be displayed and the unit will enter trial operation Trial operation will stop automatically after around 30 minutes To stop trial operation press ON OFF...

Page 14: ...supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used due to unavoidable r...

Page 15: ...unt of power in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips t...

Page 16: ...1102 HT 3P254362 3E M10B207 Two dimensional bar code is a code for manufacturing 00_CV_3P254362 3E fm Page 2 Tuesday December 7 2010 7 19 PM...

Reviews: