Outdoor Unit Installation

3.

Flaring the pipe end 

1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing 

downward so that the chips do not enter the pipe.

3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.

 WARNING

• Do not use mineral oil on flared part.
• Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
• Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
• Do never install a drier to this R410A unit in order to guarantee its lifetime.
• The drying material may dissolve and damage the system.
• Incomplete flaring may cause refrigerant gas leakage.

4.

Refrigerant piping

 CAUTION

• Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)
• To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R410A.)
• Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.

• Align the centres of both flares and tighten the flare nuts 3 

or 4 turns by hand.  Then tighten them fully with the torque 
wrenches. 

(Cut exactly at 

right angles.)

 Remove burrs.

Set exactly at the position shown below.

A

Flaring

Die

Check

Flare’s inner 
surface must 
be flaw-free.

The pipe end must 
be evenly flared in 
a perfect circle.

Make sure that the 
flare nut is fitted.

A

0-0.5mm

Clutch-type

Flare tool for R410A

1.0-1.5mm

Clutch-type (Rigid-type)

1.5-2.0mm

Wing-nut type (Imperial-type)

Conventional flare tool

Do not apply refrigeration 

oil to the outer surface.

Flare nut

Apply refrigeration oil to 

the inner surface of the 

flare.

Do not apply refrigeration oil to the flare nut 

avoid tightening with over torque.

[Apply oil]

Flare nut tightening torque

 

Gas side

Liquid side

 

3/8 inch

1/4 inch

 32.7-39.9N 

l

 m 

14.2-17.2N 

l

 m

 

(333-407kgf 

l

 cm) 

(144-175kgf 

l

 cm)

Valve cap tightening torque

 

Gas side

Liquid side

 

3/8 inch

1/4 inch

 21.6-27.4N 

l

 m 

21.6-27.4N 

l

 m

  (220-280kgf 

l

 cm) 

(220-280kgf 

l

 cm)

Service port cap 

10.8-14.7N 

l

 m

tightening torque 

(110-150kgf 

l

 cm)

01_EN_3P254362-3E.fm  Page 5  Tuesday, December 7, 2010  7:32 PM

Summary of Contents for RXG25K2V1B

Page 1: ...t series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instalaci n Serie Spl...

Page 2: ...DUSTRIES LTD Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64564 15G RXG25K2V1B RXG35K2V1B Shinri Sada Manager Quality Control Department DAIKIN TCF 015 N9 01 2011 KEMA Quality B...

Page 3: ...Center Bldg 2 4 12 Nakazaki Nishi Kita ku Osaka 530 8323 Japan RXG25K2V1B RXG35K2V1B 3SB64417 13L Shinri Sada Manager Quality Control Department 3SB64417 13L fm Page 1 Wednesday February 16 2011 10 3...

Page 4: ...3SB64417 13L fm Page 2 Wednesday February 16 2011 10 38 AM...

Page 5: ...ls If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant comes into contact with fire After completing installation check for refrige...

Page 6: ...8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place under the unit a...

Page 7: ...necting the FVXG indoor unit the shortest piping length should be no less than around 2 5m 1 5m Min allowable length CAUTION Set the piping length from 1 5m to 20m Wrap the insulation pipe with the fi...

Page 8: ...door Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necess...

Page 9: ...hes when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the...

Page 10: ...p valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping an...

Page 11: ...on dimensions as below 3 Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insulation O D 9 5mm O D 6 4mm...

Page 12: ...ff if has not been turned off 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn on the main power supply CAUTION Before connecting or disconnecti...

Page 13: ...the same time 4 Press MODE button twice will be displayed and the unit will enter trial operation Trial operation will stop automatically after around 30 minutes To stop trial operation press ON OFF...

Page 14: ...supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used due to unavoidable r...

Page 15: ...unt of power in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips t...

Page 16: ...1102 HT 3P254362 3E M10B207 Two dimensional bar code is a code for manufacturing 00_CV_3P254362 3E fm Page 2 Tuesday December 7 2010 7 19 PM...

Reviews: