background image

Installation manual

2

R(Y)P200+250B8W1

Split System air conditioners

4PW23688-1B

S

ELECTING

 

INSTALLATION

 

SITE

1.

Select an installation site where the following conditions are satisfied
and that meets with your customer's approval.

Places which are well-ventilated.

Places where the unit does not bother next-door neighbours.

Safe places which can withstand the unit’s weight and vibration
and where the unit can be installed level.

Places where there is no possibility of flammable gas or product
leak.

Places where servicing space can be well ensured.

Places where the indoor and outdoor units’ piping and wiring
lengths come within the allowable ranges.

Precautions

Do not install or operate the unit in rooms mentioned below.

Where mineral oil like cutting oil is present.

Where the air contains high levels of salt such as that near the
ocean.

Where sulphurous gas is present such as that in areas of hot
spring.

Where voltage fluctuates a lot such as that in factories.

In vehicles or vessels.

Where high concentrations of oil vapour or spray are present
such as that in kitchens.

Where machines generating electromagnetic waves are
present.

Where acidic or alkaline vapour is present.

2.

Prepare a water drainage channel around the foundation, to drain
waste water from around the unit.

3.

If you install the unit on a frame, please install a waterproof plate
within 150 mm of the underside of the unit in order to prevent the
invasion of water from the lower direction.

4.

When installing the unit in a place frequently exposed to snow, pay
special attention to the following:

Elevate the foundation as high as possible.

Remove the rear suction grille to prevent snow from accumulating
on the rear fins.

5.

If you install the unit on a building frame,
please install a waterproof plate (within
150 mm of the underside of the unit) in
order to avoid the drainwater dripping. (See
figure).

P

RECAUTIONS

 

ON

 

INSTALLATION

Check the strength and level of the installation ground so that
the unit will not cause any operating vibration or noise after
installation.

Unpacking and placing the unit

Remove the wooden crate from the unit. 

Remove the 4 screws fixing the unit to the pallet.

The unit must be installed on a solid longitudinal foundation
(steelbeam frame or concrete). Maximum height of the foundation
is 150 mm.

Lift the unit from the pallet and place it on its installation position.

In accordance with the foundation drawing in the figure, fix the
unit securely by means of the foundation bolts. (Prepare four
sets of M12 foundation bolts, nuts and washers each which are
available on the market.)

It is best to screw in the foundation bolts until their length are
20 mm from the foundation surface.

I

NSTALLATION

 

SERVICING

 

SPACE

Refer to 

figure 1

  for the required dimensions (mm). Choose one of

the 2 possibilities.

R

EFRIGERANT

 

PIPE

 

SIZE

 

AND

 

ALLOWABLE

 

PIPE

 

LENGTH

1.

Refrigerant pipe size

Pair system: see 

figure 2

Simultaneous operation system

Twin and triple operation system (twin: see 

figure 3

, triple: see

figure 4

)

The pipes between the outdoor unit and the branch (L1) should have
the same size as the outdoor connections. The pipes between the
branch and the indoor units (L2~L4) should have the same size as
the indoor connections. Branch: see marking ‘

’  on 

figure 3

  and

figure 4

.

Double twin operation system: see figure 5

The pipes between the outdoor unit and the branch (L1) should have
the same size as the outdoor connections. The pipes between the
branch and the indoor units (L4~L7) should have the same size as
the indoor connections. Branch: see marking ‘

’ on 

figure 5

.

For branch pipes L2 and L3: see table below for the branch pipe
sizes.

Make sure to provide for adequate measures in order
to prevent that the outdoor unit be used as a shelter
by small animals.

Small animals making contact with electrical parts can
cause malfunctions, smoke or fire. Please instruct the
customer to keep the area around the unit clean.

All field piping must be installed by a licensed refrigeration
technician and must comply with relevant local and
national regulations.

Refrigerant pipe size

Gas pipe

Liquid pipe

R(Y)P200

Ø28.6 x t1.15

Ø12.7 x t0.90

R(Y)P250

Ø15.9 x t0.95

Branch pipe size L2, L3

Gas pipe

Liquid pipe

R(Y)P200+250

Ø19.1 x t1.00

Ø9.5 x t0.80

NOTE

In case the required pipe sizes (inch sizes) are not
available, it is also allowed to use other diameters (mm
sizes), taken the following into account:

select the pipe size nearest to the required size.

use the suitable adapters for the change-over
from inch to mm pipes (field supply).

80

80

726

1000

4x Ø15

20

Summary of Contents for RP200B8W1

Page 1: ...INSTALLATION MANUAL RP200B8W1 RP250B8W1 RYP200B8W1 RYP250B8W1 Split System air conditioners...

Page 2: ...500 Y B1 300 Y 2 H 1500 A 500 h 500 B2 100 H 1500 X A 500 X 2 h 500 Y B2 100 Y 2 h H A B1 B2 mm 10 10 10 20 20 B1 A B2 A 50 50 50 50 100 100 B2 A 2 2 H1 L1 3 3 H1 H2 L3 L1 L2 4 4 H1 H2 L4 L1 L3 L2 5...

Page 3: ...ck konstrukce A a pozitivn zji t no B v souladu s osv d en m C jak bylo uvedeno v souboru technick konstrukce D a pozitivn zji t no E pou it modul F G Kategorie rizik H Viz tak n sleduj c strana 15 ka...

Page 4: ...n Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana P bar Izgatavo anas numurs un...

Page 5: ...operation system Refer to catalogues for details Never operate the unit without the thermistor R3T burning of the compressor may result When closing the service panels take care that the tightening to...

Page 6: ...et The unit must be installed on a solid longitudinal foundation steelbeam frame or concrete Maximum height of the foundation is 150 mm Lift the unit from the pallet and place it on its installation p...

Page 7: ...screw keys 2 Turn it all the way until the shaft stops 3 Tighten the cap firmly To close 1 Remove the cap and turn the shaft clockwise 2 Tighten the shaft firmly until it reaches the sealed area 4 of...

Page 8: ...vacuum pump which can evacuate to 100 7 kPa 5 Torr 755 mm Hg Evacuate the system from the liquid and gas pipes by using a vacuum pump for more than 2 hours and bring the system to 100 7 kPa After kee...

Page 9: ...e length exceeds 30 m the charging amount mentioned in the nameplate and that required for additional charging are to be totaled as the net charging amount Precaution for pumping down operation The ou...

Page 10: ...power supply line See figure 10 TEST OPERATION For the test run procedure refer to the indoor unit installation manual DISPOSAL REQUIREMENTS Dismantling of the unit treatment of the refrigerant of oil...

Page 11: ...X1M TERMINAL STRIP Y1R 4 WAY VALVE A3P PRINTED CIRCUIT BOARD DS2 SELECTOR SWITCH VARIOUS SEE PCB DS3 SELECTOR SWITCH EMERGENCY HAP LIGHT EMITTING DIODE GREEN H1P H2P LIGHT EMITTING DIODE RED R3T THERM...

Page 12: ...NOTES NOTES...

Page 13: ...8 8 2 4 5 6 2 4 5 7 9 8 6 9 9 1 2 3 3 5 5 4 10 10 3 N 50 Hz 400 V 1 2 3 11 11 1 3 2 4 5...

Page 14: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW23688 1B...