background image

Installation manual

4

R(Y)P200+250B8W1

Split System air conditioners

4PW23688-1B

Precautions for connecting pipes

When the outdoor unit is installed above the indoor unit the following
can occur:

1.

The condensated water on the stop valve can move to the indoor
unit. To avoid this, please cover the stop valve with sealing material.

2.

If the temperature is higher than 30°C and the humidity is higher than
RH 80%, then the thickness of the sealing materials should be at
least 20mm in order to avoid condensation on the surface of the
sealing.

Please refer to the table for the dimensions for processing flares
and for the tightening torques. (Too much tightening will end up
in splitting of the flare.)

When connecting the flare nut, coat the flare both inside and
outside with refrigerating ether or ester oil and initially tighten by
hand 3 or 4 turns before tightening firmly.
Coat here with ether oil or ester oil

Make sure to flow nitrogen gas through the pipe when brazing.

Take  measures against contamination when installing pipes.
Prevent foreign materials like moisture and other impurities from
mixing into the system.

Great caution is needed when passing copper tubes through walls.

In case of simultaneous operation system

Upward and downward piping should be performed at the main
piping line.

Use branch piping kit (optional) for branching refrigerant pipes.

Precautions to be taken. (For details, refer to the manual
attached to branch piping kit.)
-

Install the branch pipes horizontally (Maximum inclination: 
20 degrees or less)

-

Length of branch pipe to the indoor unit should be as short as 
possible.

-

Try to keep lengths of both branch pipes to the indoor unit 
equal.

E

VACUATING

The units were checked for leaks by the manufacturer.

The refrigerant lines fitted in site are to be checked for leaks by the
fitter.

Confirm that the valves are firmly closed before pressure test or
vacuuming.

Air tight test and vacuum drying: refer to 

figure 8

Air tight test: make sure to use nitrogen gas. Pressurize the
liquid and gas pipes to 3.3 MPa (do not pressurize more than
3.3 MPa). If the pressure drops, check where the nitrogen
comes from.

Vacuum drying: use a vacuum pump which can evacuate to
–100.7 kPa (5 Torr, –755 mm Hg).

Evacuate the system from the liquid and gas pipes by using a
vacuum pump for more than 2 hours and bring the system to
–100.7 kPa. After keeping the system under that condition for
more than one hour, check if the vacuum gauge rises or not.
If it rises, the system may either contain moisture inside or
have leaks.

Following should be executed if there is a possibility of moisture
remaining in the pipe (if piping work is carried out during the
raining season or over a long period of time, rainwater may enter
the pipe during work).
After evacuating the system for 2 hours, pressurize the system to
0.05 MPa (vacuum break) with nitrogen gas and evacuate the
system again using the vacuum pump for 1 hour to –100.7 kPa
(vacuum drying). If the system cannot be evacuated to –100.7 kPa
within 2 hours, repeat the operation of vacuum break and vacuum
drying.
Then after leaving the system in vacuum for 1 hour, confirm that
the vacuum gauge does not rise.

NOTE

Refer to the table for stop valve tightening
torques.

Be sure to use both a spanner and a torque
wrench when connecting or disconnecting pipes
to or from the unit.

Use a charging hose with push rod when using
the service port (5).

Check for refrigerant gas leakage after tightening
the cap.

Make sure to keep the valve open during
operation.

Stop valve tightening torques

R(Y)P200

R(Y)P250

Service port (5)

9.8~14.7 N•m (100~150 kgf•cm)

Valve cap (1)

Liquid pipe

19.6~24.5 N•m

(200~250 kgf•cm)

29.4~34.3 N•m

(300~350 kgf•cm)

Gas pipe

39.2~44.1 N•m (400~450 kgf•cm)

Piping size

Flare nut tightening 

torque

A dimensions for 

processing flares (mm

)

Flare shape

Ø9.5

32.7~39.9 N•m

(333~407 kgf•cm)

12.0~12.4

Ø12.7

49.5~60.3 N•m

(504~616 kgf•cm)

15.4~15.8

Ø15.9

61.8~75.4 N•m

(630~770 kgf•cm)

18.6~19.0

Ø19.1

97.2~118.6 N•m

(989.8~1208 kgf•cm)

22.9~23.3

Place

Installation period

Protection method

Outdoor unit

More than a month

Pinch the pipe

Less than a month

Pinch or tape the pipe

Indoor

Regardless of the 

period

R=0.4~0.8

45

° ±

2

90

°±

2

A

Do not purge the air with refrigerants. Use a vacuum pump
to vacuum the installation. No additional refrigerant is 
provided for air purging.

A

Pair system

B

Simultaneous operation system

1

Pressure gauge

2

Nitrogen

3

Refrigerant

4

Weighing machine

5

Vacuum pump

6

Stop valve

7

Main pipe

8

Branched pipes

9

Pipe branching kit (optional)

Summary of Contents for RP200B8W1

Page 1: ...INSTALLATION MANUAL RP200B8W1 RP250B8W1 RYP200B8W1 RYP250B8W1 Split System air conditioners...

Page 2: ...500 Y B1 300 Y 2 H 1500 A 500 h 500 B2 100 H 1500 X A 500 X 2 h 500 Y B2 100 Y 2 h H A B1 B2 mm 10 10 10 20 20 B1 A B2 A 50 50 50 50 100 100 B2 A 2 2 H1 L1 3 3 H1 H2 L3 L1 L2 4 4 H1 H2 L4 L1 L3 L2 5...

Page 3: ...ck konstrukce A a pozitivn zji t no B v souladu s osv d en m C jak bylo uvedeno v souboru technick konstrukce D a pozitivn zji t no E pou it modul F G Kategorie rizik H Viz tak n sleduj c strana 15 ka...

Page 4: ...n Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana P bar Izgatavo anas numurs un...

Page 5: ...operation system Refer to catalogues for details Never operate the unit without the thermistor R3T burning of the compressor may result When closing the service panels take care that the tightening to...

Page 6: ...et The unit must be installed on a solid longitudinal foundation steelbeam frame or concrete Maximum height of the foundation is 150 mm Lift the unit from the pallet and place it on its installation p...

Page 7: ...screw keys 2 Turn it all the way until the shaft stops 3 Tighten the cap firmly To close 1 Remove the cap and turn the shaft clockwise 2 Tighten the shaft firmly until it reaches the sealed area 4 of...

Page 8: ...vacuum pump which can evacuate to 100 7 kPa 5 Torr 755 mm Hg Evacuate the system from the liquid and gas pipes by using a vacuum pump for more than 2 hours and bring the system to 100 7 kPa After kee...

Page 9: ...e length exceeds 30 m the charging amount mentioned in the nameplate and that required for additional charging are to be totaled as the net charging amount Precaution for pumping down operation The ou...

Page 10: ...power supply line See figure 10 TEST OPERATION For the test run procedure refer to the indoor unit installation manual DISPOSAL REQUIREMENTS Dismantling of the unit treatment of the refrigerant of oil...

Page 11: ...X1M TERMINAL STRIP Y1R 4 WAY VALVE A3P PRINTED CIRCUIT BOARD DS2 SELECTOR SWITCH VARIOUS SEE PCB DS3 SELECTOR SWITCH EMERGENCY HAP LIGHT EMITTING DIODE GREEN H1P H2P LIGHT EMITTING DIODE RED R3T THERM...

Page 12: ...NOTES NOTES...

Page 13: ...8 8 2 4 5 6 2 4 5 7 9 8 6 9 9 1 2 3 3 5 5 4 10 10 3 N 50 Hz 400 V 1 2 3 11 11 1 3 2 4 5...

Page 14: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW23688 1B...

Reviews: