background image

 

 

1

B1

A

10

 1500       

⇒ 

A  

 

 500

 

 500         

⇒ 

B1 

 300

H = 1500+X  

⇒ 

A  

 

 500+X/2

h

 

= 500+Y    

⇒ 

B1

 

 300+Y/2

 1500       

⇒ 

A  

 

 500

 

 500         

⇒ 

B2 

 100

H = 1500+X  

⇒ 

A  

 

 500+X/2

h

 

= 500+Y    

⇒ 

B2

 

 100+Y/2

h

H

A

B1
B2

(mm)

10

10

10

20

20

B1

A

B2

A

50

50

50

50

100

100

B2

A

 

 

2

H1

L1

 

 

3

H1

H2

L3

L1

L2

 

 

4

H1

H2

L4

L1

L3

L2

 

 

5

H1

H2

L7

L1

L6

L5

L4

L3

L2

 

 

6

B

A

C

E

D

H

 

 

7

5

1

2

3

4

Summary of Contents for RP200B8W1

Page 1: ...INSTALLATION MANUAL RP200B8W1 RP250B8W1 RYP200B8W1 RYP250B8W1 Split System air conditioners...

Page 2: ...500 Y B1 300 Y 2 H 1500 A 500 h 500 B2 100 H 1500 X A 500 X 2 h 500 Y B2 100 Y 2 h H A B1 B2 mm 10 10 10 20 20 B1 A B2 A 50 50 50 50 100 100 B2 A 2 2 H1 L1 3 3 H1 H2 L3 L1 L2 4 4 H1 H2 L4 L1 L3 L2 5...

Page 3: ...ck konstrukce A a pozitivn zji t no B v souladu s osv d en m C jak bylo uvedeno v souboru technick konstrukce D a pozitivn zji t no E pou it modul F G Kategorie rizik H Viz tak n sleduj c strana 15 ka...

Page 4: ...n Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana P bar Izgatavo anas numurs un...

Page 5: ...operation system Refer to catalogues for details Never operate the unit without the thermistor R3T burning of the compressor may result When closing the service panels take care that the tightening to...

Page 6: ...et The unit must be installed on a solid longitudinal foundation steelbeam frame or concrete Maximum height of the foundation is 150 mm Lift the unit from the pallet and place it on its installation p...

Page 7: ...screw keys 2 Turn it all the way until the shaft stops 3 Tighten the cap firmly To close 1 Remove the cap and turn the shaft clockwise 2 Tighten the shaft firmly until it reaches the sealed area 4 of...

Page 8: ...vacuum pump which can evacuate to 100 7 kPa 5 Torr 755 mm Hg Evacuate the system from the liquid and gas pipes by using a vacuum pump for more than 2 hours and bring the system to 100 7 kPa After kee...

Page 9: ...e length exceeds 30 m the charging amount mentioned in the nameplate and that required for additional charging are to be totaled as the net charging amount Precaution for pumping down operation The ou...

Page 10: ...power supply line See figure 10 TEST OPERATION For the test run procedure refer to the indoor unit installation manual DISPOSAL REQUIREMENTS Dismantling of the unit treatment of the refrigerant of oil...

Page 11: ...X1M TERMINAL STRIP Y1R 4 WAY VALVE A3P PRINTED CIRCUIT BOARD DS2 SELECTOR SWITCH VARIOUS SEE PCB DS3 SELECTOR SWITCH EMERGENCY HAP LIGHT EMITTING DIODE GREEN H1P H2P LIGHT EMITTING DIODE RED R3T THERM...

Page 12: ...NOTES NOTES...

Page 13: ...8 8 2 4 5 6 2 4 5 7 9 8 6 9 9 1 2 3 3 5 5 4 10 10 3 N 50 Hz 400 V 1 2 3 11 11 1 3 2 4 5...

Page 14: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW23688 1B...

Reviews: