![background image](http://html1.mh-extra.com/html/daikin/r32-sky-air-rzag-m/r32-sky-air-rzag-m_service-manual_4705442098.webp)
ESIE17-08
|
Part 3. Repair
3.3. Unit specific repair procedures
Page 98
15/11/18
|
Version 1.1
R32 Sky-Air RZAG-M
Figure 3-30: Stripping the main PCB assembly 3-phase (rear)
Installation
1. Proceed in reverse order.
1. Terminal connector
4. Electrical noise filter PCB (3-phase)
2. Connector
5. Standoff
3. Ground wire
6. Cable clamp
6
5
6
6
3
4
2
1
5
6