![background image](http://html1.mh-extra.com/html/daikin/r32-sky-air-rzag-m/r32-sky-air-rzag-m_service-manual_4705442097.webp)
ESIE17-08
|
Part 3. Repair
3.3. Unit specific repair procedures
15/11/18
|
Version 1.1
Page 97
R32 Sky-Air RZAG-M
Figure 3-29: Stripping the main PCB assembly 3-phase (front)
Finally, strip the Main PCB assembly (rear)
19. Unplug the connector (2).
20. Unplug the terminal wires (1).
21. Remove the wiring from the cable clamps (6) if necessary.
22. Unlock the 4 standoffs (5) that fix the electrical noise PCB (4).
23. Remove the electrical noise filter PCB (4) from the main PCB assembly.
1. Screw ground wire
3. Terminal connectors
2. Screw
2
3
1