ESIE19-06
|
Part 3. Repair
3.2. Unit specific repair procedures
Page 48
21/01/20
|
Version 1.1
Modular L Smart
3.2.1.5. Removing heat exchanger
PRELIMINARY ACTIONS
1. Switch off the Daikin unit via the user interface.
2. Switch off the Daikin unit with the field supplied circuit breaker.
PROCEDURE
Removal
1. Remove the black gasket.
2. Loosen and remove the screws that fix the heat recovery and the carpentries.
3. Pull the heat recovery.
Installation
1. Proceed in reverse order to fix again the heat exchanger.
Summary of Contents for Modular L Smart
Page 1: ...Service Manual Modular L Smart ESIE19 06 ...
Page 6: ...ESIE19 06 Page 6 21 01 20 Version 1 1 Modular L Smart ...
Page 16: ...ESIE19 06 Part 1 Introduction 1 4 How to use Page 16 21 01 20 Version 1 1 Modular L Smart ...
Page 59: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit 21 01 20 Version 1 1 Page 59 Modular L Smart ...
Page 60: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit Page 60 21 01 20 Version 1 1 Modular L Smart ...