ESIE19-06
|
Part 3. Repair
3.2. Unit specific repair procedures
Page 44
21/01/20
|
Version 1.1
Modular L Smart
3.2.1.3. Removing Smart Gateway
PRELIMINARY ACTIONS
1. Switch off the Daikin unit via the user interface.
2. Switch off the Daikin unit with the field supplied circuit breaker.
PROCEDURE
Removal
1. Remove the switchbox cover, refer to
"Basic removal - removing switchbox cover" on page 40
.
2. Unplug all connectors ACS in, FAN1, FAN2, PS1, PS2, PS3, PS4, DAMP OUT, from the board.
3. Remove clips that fix the board.
4. Remove the main board from the switchbox.
Figure 3-3: Removing the Smart Gateway board
Installation
1. Proceed in reverse order to fix again the Smart Gateway..
Summary of Contents for Modular L Smart
Page 1: ...Service Manual Modular L Smart ESIE19 06 ...
Page 6: ...ESIE19 06 Page 6 21 01 20 Version 1 1 Modular L Smart ...
Page 16: ...ESIE19 06 Part 1 Introduction 1 4 How to use Page 16 21 01 20 Version 1 1 Modular L Smart ...
Page 59: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit 21 01 20 Version 1 1 Page 59 Modular L Smart ...
Page 60: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit Page 60 21 01 20 Version 1 1 Modular L Smart ...