SiSG121917E
Trial Operation
Part 7 Trial Operation and Field Settings
188
With ARC433 Series Remote Controller
1. Press
ON/OFF
button to turn on the system.
2. Press the center of
TEMP
button and
MODE
button at the same time.
3. Press
MODE
button twice.
(
T
appears on the display to indicate that trial operation is selected.)
4. Press
MODE
button and select operation mode.
5. Trial operation terminates in about 30 minutes and switches into normal mode.
To quit a trial operation, press
ON/OFF
button.
With BRC086A22 Remote Controller
1. Completely open the stop valve on gas side.
2. Completely open the stop valve on liquid side.
3. Set to cooling or heating operation using the remote controller, and then start the operation
by pressing
ON/OFF
button.
4. Press
INSPECTION
button 2 times, and let the operation continue for 3 minutes in the test
operation mode.
5. Press
INSPECTION
button 1 time to return to normal operation mode.
6. Check the functions in accordance with operation manual.
2
1, 5
3
2, 3, 4
(R16394)
4, 5
(R24947)
3