![background image](http://html1.mh-extra.com/html/daikin/mcquay-im-934-5/mcquay-im-934-5_installation-and-maintenance-data_2460260008.webp)
Page 8 of 48
IM 934-5
Installing Subbase(s)
Electric Subbase
Note: An electrical subbase is optional for all 208V and
230V units. A subbase is required for all 265V units.
The subbase is available in 3" (76mm) or 4" (102mm)
heights. The subbase contains leveling legs for
adjustment of up to 1" (25mm) additional height. All
subbases are factory supplied, field installed options.
Procedure
1. If the minimum depth subbase is required, discard the
side extension pieces.
2. If more than the minimum depth is required, determine
the depth of the side extension pieces desired and break
at the proper score line. Insert the extension pieces into
the front assembly and secure with two short black
screws at each side.
3. Insert leveling bolts into subbase bottom flange. Four (4)
bolts are required if side extensions are used. Only two
(2) bolts are required if side extensions are not used.
4. Place the subbase on the floor and align its center line
with the center line of the wall opening. Do not fasten the
subbase to the floor. Attach the subbase to the wall sleeve
using the clips provided with the subbase.
5. The wiring should be roughed in and the conduit
connected to the subbase junction box. Complete the
installation by wiring the receptacle to the incoming
power supply.
Figure 7: Electric Subbase Dimensions
Front Elevation (Three Front Panels in Place)
3" (76mm) or 4" (102mm)
0" (0mm) to 1" (25mm)
41
1
⁄
2
"
(1054mm)
Leveling Screw (4 Places)
17"
(432mm)
12"
(305mm)
5"
(127mm)
2
1
⁄
2
"
(63.5mm)
0" (0mm) to 9
3
⁄
8
" (238mm)
4
3
⁄
8
" (111mm)
1
1
⁄
2
" (38mm)
7/8"
(22mm)
5/8" (16mm)
3"
Electrical Knockouts
C
L
Plan
Figure 8: Standard Electric Subbase Descriptions
Electrical Junction Box for
Main Power Connection
Receptacle (Req’d
on 265V Units)
Plug/Cord Cover
(Req’d on 265V Units)
Knockouts for Optional
Fuse & Disconnect Switch
3" x 5" (76 to 127mm)
Opening for Electrical
and/or Drain Rough-In
Notes:
1.
Side Channel Dimensions:
Adjustable from 4-3/8" to 13-3/4"
(111mm to 349mm)
2.
Height: 3" to 4" (76mm to 102mm)
with leveling screws adjustable from
0" to 1" (0mm to 25m)
3.
Subbase is optional on 208V and
230V units. Subbase is required
on all 265V units and units with
hydronic heat. Subbase extends to
front edge of unit when furnished
with hydronic heat. Hydronic
subbase is flush with the front of the
cabinet. Electric subbase is flush
with wall sleeve.
Summary of Contents for McQuay IM 934-5
Page 46: ......
Page 47: ......
Page 48: ...2013 McQuay International 800 432 1342 www daikinmcQuay com IM 934 5 8 13 Page 48 of 48...