Removal Procedure
239
8
Lift the compressor up
to remove.
Cautions for restoration
1. Restore the piping by non-
oxidation brazing.
2. It is required to prevent the
carbonization of the oil inside
the four way valve and the
deterioration of the gaskets
affected by heat. (Keep
below 120°C.) For the sake
of this, wrap the four way
valve with wet cloth and
provide water so that the
cloth does not dry.
In case of difficulty with gas
brazing machine
1. Disconnect the brazed part
where is easy to disconnect
and restore.
2. Cut pipes on the main unit
with a tube cutter in order to
make it easy to disconnect.
Note:
Do not use a metal saw for
cutting pipes by all means
because the sawdust comes
into the circuit.
When withdrawing the pipes,
be careful not to pinch them
firmly with pliers. The pipes
may get deformed.
Provide a protective sheet or
a steel plate so that the
brazing flame cannot
influence peripheries.
Be careful so as not to burn
the compressor terminals,
the name plate, the heat
exchanger fin.
Step
Procedure
Points
(R8202)
SIENBE04-925_A_FRONT.pdf 254
24/02/2011 13:54:16
Summary of Contents for Inverter FTXL20G2V1B
Page 8: ...SiENBE04 925_A vi Table of Contents...
Page 14: ...Introduction SiENBE04 925_A xii...
Page 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2...
Page 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4...
Page 20: ...Specifications SiENBE04 925_A 6 Specifications...