![background image](http://html2.mh-extra.com/html/daikin/inverter-ftxl20g2v1b/inverter-ftxl20g2v1b_service-manual_3625026207.webp)
Outdoor Unit - RXL20G2V1B9
SiENBE04-925_A
192
Removal Procedure
3.2
Removal of Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Disconnect the
connector for the
overload protector
[S40].
Preparation
Remove the panels and
disconnect the connector for
the fan motor according to
the “Removal of Outer
Panels / Fan Motor”.
2
Disconnect the
connector for the four
way valve coil [S80].
3
Disconnect the 2
connectors for the
reactor.
(R11846)
[S40]
(R11848)
[S80]
(R11844)
SIENBE04-925_A_FRONT.pdf 207
24/02/2011 13:54:09
Summary of Contents for Inverter FTXL20G2V1B
Page 8: ...SiENBE04 925_A vi Table of Contents...
Page 14: ...Introduction SiENBE04 925_A xii...
Page 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2...
Page 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4...
Page 20: ...Specifications SiENBE04 925_A 6 Specifications...