![background image](http://html2.mh-extra.com/html/daikin/ftx09nmvju/ftx09nmvju_service-manual_3285580125.webp)
SiUS091601E
Pump Down Operation
Trial Operation and Field Settings
114
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Detail
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4. After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to Forced Cooling Operation on page 115 for details.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench
Summary of Contents for FTX09NMVJU
Page 12: ...SiUS091601E 1 List of Functions Part 1 List of Functions 1 Functions 2...
Page 15: ...SiUS091601E Specifications 4 Part 2 Specifications 1 Specifications 5...
Page 65: ...SiUS091601E Remote Controller 54 Part 5 Remote Controller 1 FTX Series 55 2 FVXS Series 57...
Page 144: ...Revision History Month Year Version Revised contents 02 2016 SiUS091601E First edition...