![Daikin FCA71AV16 Installation Manual Download Page 53](http://html1.mh-extra.com/html/daikin/fca71av16/fca71av16_installation-manual_3211679053.webp)
14-2
Packing
❶
•
Cover the unit with polythene
product
cover, then p
ick the unit
up and settle it
down on the
bottom skid(
d
)
as
shown
in
figure
.
❷
•
Put
the cardboard box
(
c
)
upon
the
unit
as shown in figure.
❸
•
Fix the straps
(a)
on the unit
by using portable strap fixing machine
as
shown
in figure.
(Use marked reference for placing
straps)
a)
b)
c)
Strap
Starp
Cutter
Cardboard bo
x
d
)
Bottom
Skid
e
)
Portable strap
fixing machine
3
9
3
9
3
9
5
2
Summary of Contents for FCA71AV16
Page 34: ...33 RZCA71AV16...
Page 35: ...34 RZCA71AV16...
Page 36: ...35...
Page 37: ...36...
Page 38: ...37...
Page 39: ...38 RZCA71AV16...
Page 40: ...39 RZCA71AV16...
Page 41: ...40...
Page 42: ...41...
Page 43: ...42 RZCA71AV16 RZCA71AV16 20 g per meter For Piping Length Exceeding 10 m RZCA71AV16...
Page 44: ...43 45...
Page 45: ...44 RZCA71AV16 RZCA71AV16...
Page 46: ...45 RZCA71AV16 RZCA71AV16 Power Supply 50 Hz 230 V...
Page 47: ...46...
Page 50: ...49...
Page 51: ...50 RZCA71AV16...