![background image](http://html1.mh-extra.com/html/daikin/fca71av16/fca71av16_installation-manual_3211679052.webp)
a)
b)
c)
Strap
Starp
Cutter
Cardboard bo
x
❶
•
Cut all the
straps
(a)
from
the unit
using
strap
cutter(
b
) as
shown in
figure.
❷
❸
•
Remove
the
bottom
skid
(d) with EPS by
pulling the unit up
, then remove the
polythene product cover by pulling it up
❹
14.
Unpacking &
P
acking of the
Outdoor U
nit
14-1
Unpacking
•
Remove
t
he cardboard box
(c)
from the unit
after opening it and
pulling it up
as shown in figure.
d
)
Bottom
Skid
3
9
3
9
3
9
3
9
3
8
3
8
3
8
5
1
Summary of Contents for FCA71AV16
Page 34: ...33 RZCA71AV16...
Page 35: ...34 RZCA71AV16...
Page 36: ...35...
Page 37: ...36...
Page 38: ...37...
Page 39: ...38 RZCA71AV16...
Page 40: ...39 RZCA71AV16...
Page 41: ...40...
Page 42: ...41...
Page 43: ...42 RZCA71AV16 RZCA71AV16 20 g per meter For Piping Length Exceeding 10 m RZCA71AV16...
Page 44: ...43 45...
Page 45: ...44 RZCA71AV16 RZCA71AV16...
Page 46: ...45 RZCA71AV16 RZCA71AV16 Power Supply 50 Hz 230 V...
Page 47: ...46...
Page 50: ...49...
Page 51: ...50 RZCA71AV16...