ESIE09-05
Test Operation
Test Operation
89
1.1.6 Confirmation on Normal Operation
•
Conduct normal unit operation after the check operation has been completed.
(When outdoor air temperature is 24°CDB or higher, the unit can not be operated with
heating mode. See the installation manual attached.)
•
Confirm that the AHU/outdoor units can be operated normally.
(When an abnormal noise due to liquid compression by the compressor can be heard, stop
the unit immediately, and turn on the crankcase heater to heat up it sufficiently, then start
operation again.)
•
Operate AHU one by one to check that the corresponding outdoor unit operates.
•
Confirm that the AHU discharges cold air (or warm air).
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Summary of Contents for ERQ
Page 2: ...http splitoff ru tehn doc html...
Page 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Page 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Page 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Page 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...