Planning and installation instructions
20
E E EKSH26P
DAIKIN Solar P-SYS
008.1629544_01 – 12/2016
4
x
Installation
5. If there are 2 and more solar panels, install double terminal
blocks and compensators.
6. Raise further covered solar panels above the mounting
profile, set down and carefully hook into the securing clips
and push together.
7. Screw the double terminal blocks tight between the flat solar
panels.
5h
Single terminal block with equipotential bonding terminal
5i
Single terminal block
Fig. 4-7
Work step 4
3a
Double terminal block for solar panel fastening
3c
Compensator for solar panel connection with mounting supports
Fig. 4-8
Step 5 for 2 or more panels
0 mm
ADM
a+c+d
IDM / FDM
a+b+c
ADM
b
IDM / FDM
d
a
b
c
d
5h
5i
1.
2.
Click
3.
Click
3a
!
3c
3a
a
b
c
d
3c
3c
(2x)
3a
(2x)
CAUTION!
If the connections on the flat solar panel
(FIX VBP, pos. 3c) are not fitted with extreme
caution, the seal ring can become damaged.
This causes leaks in the system.
●
Always fit the expansion joints to the flat solar
panels with extreme caution.
●
Bring the next flat solar panel into alignment
with the connection pipes of the previous flat
solar panel when pushing together.
CAUTION!
If the retaining clamps do not click in place au-
dibly, the DAIKIN Solar system can develop
leaks and thus restrict operational safety.
Reasons for the retaining clamps not engaging:
●
Flat solar panels not completely pushed
together.
●
Absorber position moved (push the absorber
into the connections on the opposite side in
the correct position, wearing protective
gloves).
Fig. 4-9
Step 6 for 2 or more panels
Fig. 4-10 Step 7
Click
3c
3a
3c
3a
Click