background image

6 Piping installation

Installation manual

9

FVXM25~50A2V1B
Split system air conditioners
3P477070-2H – 2020.06

6

Piping installation

6.1

Preparing refrigerant piping

6.1.1

Refrigerant piping requirements

NOTICE

The  piping  and  other  pressure-containing  parts  shall  be
suitable  for  refrigerant.  Use  phosphoric  acid  deoxidised
seamless copper for refrigerant.

▪ Foreign materials inside pipes (including oils for fabrication) must

be ≤30 mg/10 m.

Refrigerant piping diameter

Use the same diameters as the connections on the outdoor units:

Class

Pipe outer diameter (mm)

Liquid piping

Gas piping

25+35

Ø6.4

Ø9.5

50

Ø6.4

Ø12.7

Refrigerant piping material

Piping material:

 Phosphoric acid deoxidised seamless copper.

Piping temper grade and thickness:

Outer diameter

(Ø)

Temper grade

Thickness (t)

(a)

6.4 mm (1/4")

Annealed (O)

≥0.8 mm

t

Ø

9.5 mm (3/8")

12.7 mm (1/2")

(a)

Depending on the applicable legislation and the maximum
working pressure of the unit (see "PS High" on the unit name
plate), larger piping thickness might be required.

6.1.2

Refrigerant piping insulation

▪ Use polyethylene foam as insulation material:

▪ with a heat transfer rate between 0.041 and 0.052 W/mK (0.035

and 0.045 kcal/mh°C)

▪ with a heat resistance of at least 120°C

▪ Insulation thickness

Pipe outer diameter

p

)

Insulation inner

diameter (Ø

i

)

Insulation thickness

(t)

6.4 mm (1/4")

8~10 mm

≥10 mm

9.5 mm (3/8")

12~15 mm

≥13 mm

12.7 mm (1/2")

14~16 mm

≥13 mm

Ø

i

Ø

i

t

Ø

p

Ø

p

If  the  temperature  is  higher  than  30°C  and  the  humidity  is  higher
than RH 80%, the thickness of the insulation materials should be at
least  20  mm  to  prevent  condensation  on  the  surface  of  the
insulation.

6.2

Connecting the refrigerant piping

DANGER: RISK OF BURNING/SCALDING

6.2.1

To connect the refrigerant piping to the
indoor unit

WARNING: MILDLY FLAMMABLE MATERIAL

The refrigerant inside this unit is mildly flammable.

Pipe  length

.  Keep  refrigerant  piping  as  short  as  possible.

Minimum is 3 m.

1

Connect refrigerant piping to the unit using 

flare connections

.

2

Insulate

 the refrigerant piping on the indoor unit as follows:

a

b

c

d

a

Gas pipe

b

Gas pipe insulation

c

Liquid pipe

d

Liquid pipe insulation

NOTICE

Make  sure  to  insulate  all  refrigerant  piping.  Any  exposed
piping might cause condensation.

3

Close  the  slit  on  the  refrigerant  pipe  connection  and  secure  it
with a tape (field supply). Make sure there are no gaps.

4

Wrap  the  slit  and  the  end  of  the  insulation  of  the  connected
refrigerant  piping  with  insulation  piece  (accessory).  Make  sure
there are no gaps.

a

b

a

a

e

b

e

c

b

a

d

c

d

b

a

Refrigerant pipe connection

b

Refrigerant piping (field supply)

c

Slit

d

Tape

e

Insulation piece (accessory)

7

Electrical installation

DANGER: RISK OF ELECTROCUTION

WARNING

ALWAYS use multicore cable for power supply cables.

WARNING

Use  an  all-pole  disconnection  type  breaker  with  at  least
3  mm  between  the  contact  point  gaps  that  provide  full
disconnection under overvoltage category III.

WARNING

If the supply cord is damaged, it MUST be replaced by the
manufacturer,  its  service  agent  or  similarly  qualified
persons in order to avoid a hazard.

Summary of Contents for CVXM20A2V1B

Page 1: ...Installation manual Split system air conditioners English Installation manual Split system air conditioners CVXM20A2V1B FVXM25A2V1B FVXM35A2V1B FVXM50A2V1B...

Page 2: ...ical data 11 11 1 Wiring diagram 12 11 1 1 Unified wiring diagram legend 12 1 About the documentation 1 1 About this document INFORMATION Make sure that the user has the printed documentation and ask...

Page 3: ...ticularly on the high pressure side Do NOT use taped wires stranded conductor wires extension cords or connections from a star system They can cause overheating electrical shock or fire Do NOT install...

Page 4: ...0 mA 4 1 3 Setting the wireless LAN The customer is responsible for providing Smartphone or tablet with minimum supported version of Android or iOS specified on http www onlinecontroller daikineurope...

Page 5: ...trical wiring box cover 1 Open the terminal block 2 Remove 1 screw from the electrical wiring box 3 Unhook the 2 tabs on the electrical wiring box cover and remove it b a c c b a Screw b Wiring box co...

Page 6: ...iping hole location g Left bottom piping hole location h Right bottom piping hole location 6 Temporarily secure the mounting plate on the wall 7 Make sure the mounting plate is level 8 Mark the centre...

Page 7: ...it 44 22 Secure the unit to the extra filler board and to the floor using 6 screws M4 25L field supply 6 23 When the complete installation is finished attach the front panel and the front grille in th...

Page 8: ...extension hose use a polyvinyl adhesive agent for glueing Condensation Take measures against condensation Insulate the complete drain piping in the building To connect the drain piping to the indoor...

Page 9: ...higher than 30 C and the humidity is higher than RH 80 the thickness of the insulation materials should be at least 20 mm to prevent condensation on the surface of the insulation 6 2 Connecting the re...

Page 10: ...Pull the wires to make sure that they are securely attached then retain the wires with the cable clamp 6 Make sure that the wires do not come in contact with the metal parts of the heat exchanger 7 I...

Page 11: ...performed in cooling or heating mode Prerequisite Test run should be performed in accordance with the operation manual of the indoor unit to make sure that all functions and parts are working properl...

Page 12: ...ght emitting diode HAP Light emitting diode service monitor green HIGH VOLTAGE High voltage IES Intelligent eye sensor IPM Intelligent power module K R KCR KFR KHuR K M Magnetic relay L Live Symbol Me...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ...3P477070 2H 2020 06 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...