5 Unit installation

Installation manual

7

FVXM25~50A2V1B
Split system air conditioners
3P477070-2H – 2020.06

Half-concealed installation

54

30

f

734~740

170

350

70

200

593~595

170

350

d

e

c

c

a

A

B

(mm)

a

a

75

54

Ø60

Ø60

54

75

C

159

238

689

159

b

b

06

75

75

54

h

g

634.5

115

285

b

b

b

b

300

  5‒3 Indoor unit installation drawing: Half-concealed installation

A

Front view

B

Side view

C

Top view

a

Extra filler board

b

Screw hole 6×

c

Hole

d

Left-back piping hole location

e

Right-back piping hole location

f

Right/left piping hole location

g

Left-bottom piping hole location

h

Right-bottom piping hole location

17

Make a hole in the wall as illustrated above.

18

Install the extra filler board (field supply) in accordance with the
space between the unit and the wall. Make sure there is no gap
between the unit and the wall.

19

Drill  a  wall  hole,  depending  on  which  side  piping  is  taken  out.
See 

"5.3.2 To drill a wall hole" 

[

4

 7].

20

Remove  the  slit  portions  using  nippers.  See 

"5.3.3  To  remove

the slit portions" 

[

4

 7].

21

Open  the  front  panel,  remove  the  front  grille,  remove  the  top
and side casings (see 

"5.2 Opening the indoor unit" 

[

4

 4]).

22

Secure the unit to the extra filler board and to the floor using 6
screws M4×25L (field supply).

23

When the complete installation is finished, attach the front panel
and the front grille in their original position.

5.3.2

To drill a wall hole

CAUTION

For walls containing a metal frame or a metal board, use a
wall  embedded  pipe  and  wall  cover  in  the  feed-through
hole to prevent possible heat, electrical shock, or fire.

NOTICE

Be  sure  to  seal  the  gaps  around  the  pipes  with  sealing
material (field supply), in order to prevent water leakage.

1

Bore  a  65  mm  large  feed-through  hole  in  the  wall  with  a
downward slope towards the outside.

2

Insert a wall embedded pipe into the hole.

3

Insert a wall cover into the wall pipe.

Ø65

a b

c

a

Wall embedded pipe

b

Putty

c

Wall hole cover

4

After  completing  wiring,  refrigerant  piping  and  drain  piping,  do
NOT forget to seal the gap with putty.

5.3.3

To remove the slit portions

For  side  piping  (left/right)  and  bottom  piping  (left/right)  slit  portions
must  be  removed.  Remove  slit  portions  according  to  where  the
piping is taken out.

a

c

d

d

b

a

Bottom frame

b

Slit portion for side piping on the front grille (same on the
other side)

c

Slit portion for side piping on the bottom frame (same of
the other side)

d

Slit portion for the bottom piping

1

Cut off the slit portion using nippers.

Summary of Contents for CVXM20A2V1B

Page 1: ...Installation manual Split system air conditioners English Installation manual Split system air conditioners CVXM20A2V1B FVXM25A2V1B FVXM35A2V1B FVXM50A2V1B...

Page 2: ...ical data 11 11 1 Wiring diagram 12 11 1 1 Unified wiring diagram legend 12 1 About the documentation 1 1 About this document INFORMATION Make sure that the user has the printed documentation and ask...

Page 3: ...ticularly on the high pressure side Do NOT use taped wires stranded conductor wires extension cords or connections from a star system They can cause overheating electrical shock or fire Do NOT install...

Page 4: ...0 mA 4 1 3 Setting the wireless LAN The customer is responsible for providing Smartphone or tablet with minimum supported version of Android or iOS specified on http www onlinecontroller daikineurope...

Page 5: ...trical wiring box cover 1 Open the terminal block 2 Remove 1 screw from the electrical wiring box 3 Unhook the 2 tabs on the electrical wiring box cover and remove it b a c c b a Screw b Wiring box co...

Page 6: ...iping hole location g Left bottom piping hole location h Right bottom piping hole location 6 Temporarily secure the mounting plate on the wall 7 Make sure the mounting plate is level 8 Mark the centre...

Page 7: ...it 44 22 Secure the unit to the extra filler board and to the floor using 6 screws M4 25L field supply 6 23 When the complete installation is finished attach the front panel and the front grille in th...

Page 8: ...extension hose use a polyvinyl adhesive agent for glueing Condensation Take measures against condensation Insulate the complete drain piping in the building To connect the drain piping to the indoor...

Page 9: ...higher than 30 C and the humidity is higher than RH 80 the thickness of the insulation materials should be at least 20 mm to prevent condensation on the surface of the insulation 6 2 Connecting the re...

Page 10: ...Pull the wires to make sure that they are securely attached then retain the wires with the cable clamp 6 Make sure that the wires do not come in contact with the metal parts of the heat exchanger 7 I...

Page 11: ...performed in cooling or heating mode Prerequisite Test run should be performed in accordance with the operation manual of the indoor unit to make sure that all functions and parts are working properl...

Page 12: ...ght emitting diode HAP Light emitting diode service monitor green HIGH VOLTAGE High voltage IES Intelligent eye sensor IPM Intelligent power module K R KCR KFR KHuR K M Magnetic relay L Live Symbol Me...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ...3P477070 2H 2020 06 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...