background image

11 Technical data

Installation manual

12

FVXM25~50A2V1B

Split system air conditioners

3P477070-2H – 2020.06

11.1

Wiring diagram

11.1.1

Unified wiring diagram legend

For applied parts and numbering, refer to the wiring diagram on the
unit.  Part  numbering  is  by  Arabic  numbers  in  ascending  order  for
each part and is represented in the overview below by "*" in the part
code.

Symbol

Meaning

Symbol Meaning

Circuit breaker

Protective earth

Connection

Protective earth (screw)

,

Connector

A

Rectifier

Earth

Relay connector

Field wiring

Short-circuit connector

Fuse

Terminal

INDOOR

Indoor unit

Terminal strip

OUTDOOR

Outdoor unit

Wire clamp

Residual current
device

Symbol

Colour

Symbol

Colour

BLK

Black

ORG

Orange

BLU

Blue

PNK

Pink

BRN

Brown

PRP, PPL

Purple

GRN

Green

RED

Red

GRY

Grey

WHT

White

YLW

Yellow

Symbol

Meaning

A*P

Printed circuit board

BS*

Pushbutton ON/OFF, operation
switch

BZ, H*O

Buzzer

C*

Capacitor

AC*, CN*, E*, HA*, HE*, HL*,
HN*, HR*, MR*_A, MR*_B, S*, U,
V, W, X*A, K*R_*, NE

Connection, connector

D*, V*D

Diode

DB*

Diode bridge

DS*

DIP switch

E*H

Heater

FU*, F*U, (for characteristics,
refer to PCB inside your unit)

Fuse

FG*

Connector (frame ground)

H*

Harness

H*P, LED*, V*L

Pilot lamp, light emitting diode

HAP

Light emitting diode (service
monitor green)

HIGH VOLTAGE

High voltage

IES

Intelligent eye sensor

IPM*

Intelligent power module

K*R, KCR, KFR, KHuR, K*M

Magnetic relay

L

Live

Symbol

Meaning

L*

Coil

L*R

Reactor

M*

Stepper motor

M*C

Compressor motor

M*F

Fan motor

M*P

Drain pump motor

M*S

Swing motor

MR*, MRCW*, MRM*, MRN*

Magnetic relay

N

Neutral

n=*, N=*

Number of passes through ferrite
core

PAM

Pulse-amplitude modulation

PCB*

Printed circuit board

PM*

Power module

PS

Switching power supply

PTC*

PTC thermistor

Q*

Insulated gate bipolar transistor
(IGBT )

Q*C

Circuit breaker

Q*DI, KLM

Earth leak circuit breaker

Q*L

Overload protector

Q*M

Thermo switch

Q*R

Residual current device

R*

Resistor

R*T

Thermistor

RC

Receiver

S*C

Limit switch

S*L

Float switch

S*NG

Refrigerant leak detector

S*NPH

Pressure sensor (high)

S*NPL

Pressure sensor (low)

S*PH, HPS*

Pressure switch (high)

S*PL

Pressure switch (low)

S*T

Thermostat

S*RH

Humidity sensor

S*W, SW*

Operation switch

SA*, F1S

Surge arrester

SR*, WLU

Signal receiver

SS*

Selector switch

SHEET METAL

Terminal strip fixed plate

T*R

Transformer

TC, TRC

Transmitter

V*, R*V

Varistor

V*R

Diode bridge, Insulated-gate
bipolar transistor (IGBT) power
module

WRC

Wireless remote controller

X*

Terminal

X*M

Terminal strip (block)

Y*E

Electronic expansion valve coil

Y*R, Y*S

Reversing solenoid valve coil

Z*C

Ferrite core

ZF, Z*F

Noise filter

Summary of Contents for CVXM20A2V1B

Page 1: ...Installation manual Split system air conditioners English Installation manual Split system air conditioners CVXM20A2V1B FVXM25A2V1B FVXM35A2V1B FVXM50A2V1B...

Page 2: ...ical data 11 11 1 Wiring diagram 12 11 1 1 Unified wiring diagram legend 12 1 About the documentation 1 1 About this document INFORMATION Make sure that the user has the printed documentation and ask...

Page 3: ...ticularly on the high pressure side Do NOT use taped wires stranded conductor wires extension cords or connections from a star system They can cause overheating electrical shock or fire Do NOT install...

Page 4: ...0 mA 4 1 3 Setting the wireless LAN The customer is responsible for providing Smartphone or tablet with minimum supported version of Android or iOS specified on http www onlinecontroller daikineurope...

Page 5: ...trical wiring box cover 1 Open the terminal block 2 Remove 1 screw from the electrical wiring box 3 Unhook the 2 tabs on the electrical wiring box cover and remove it b a c c b a Screw b Wiring box co...

Page 6: ...iping hole location g Left bottom piping hole location h Right bottom piping hole location 6 Temporarily secure the mounting plate on the wall 7 Make sure the mounting plate is level 8 Mark the centre...

Page 7: ...it 44 22 Secure the unit to the extra filler board and to the floor using 6 screws M4 25L field supply 6 23 When the complete installation is finished attach the front panel and the front grille in th...

Page 8: ...extension hose use a polyvinyl adhesive agent for glueing Condensation Take measures against condensation Insulate the complete drain piping in the building To connect the drain piping to the indoor...

Page 9: ...higher than 30 C and the humidity is higher than RH 80 the thickness of the insulation materials should be at least 20 mm to prevent condensation on the surface of the insulation 6 2 Connecting the re...

Page 10: ...Pull the wires to make sure that they are securely attached then retain the wires with the cable clamp 6 Make sure that the wires do not come in contact with the metal parts of the heat exchanger 7 I...

Page 11: ...performed in cooling or heating mode Prerequisite Test run should be performed in accordance with the operation manual of the indoor unit to make sure that all functions and parts are working properl...

Page 12: ...ght emitting diode HAP Light emitting diode service monitor green HIGH VOLTAGE High voltage IES Intelligent eye sensor IPM Intelligent power module K R KCR KFR KHuR K M Magnetic relay L Live Symbol Me...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ...3P477070 2H 2020 06 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...

Reviews: