background image

9 Commissioning

Installation manual

11

FVXM25~50A2V1B
Split system air conditioners
3P477070-2H – 2020.06

3

Remove the protection foil from the Daikin eye.

INFORMATION

Be  careful  when  removing  the  protection  foil  to  avoid
damage of the sticker under it.

8.2

To close the indoor unit

8.2.1

To close the electrical wiring box and
close the terminal block

1

Hook the electrical wiring box onto the 2 tabs, close it, and fix it
with 1 screw.

2

Attach the front metal cover and fix it with the screw.

3

Close the sensor securing plate.

8.2.2

To re-install the front grille

1

Attach the front grille to the original position.

2

Secure the front grille with the 4 screws and 4 tabs.

8.2.3

To re-install the front panel

1

Insert the front panel into the grooves of the unit (3 places) and
attach the string.

2

Close the front panel and slide both sliders until they click.

3

Push  on  the  sides  of  the  front  panel  to  make  sure  the  front
panel is securely fixed.

9

Commissioning

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

9.1

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

9.1.1

To perform a test run using the user
interface

1

Press 

 to switch the system on.

2

Press the middle of 

 and 

 simultaneously.

3

Press 

 twice to choose 

 and confirm selection by pressing

.

Result: 

 on the display indicates that the test run is selected. Test

run operation will stop automatically after about 30 minutes.

4

To stop operation sooner, press the ON/OFF button.

10

Disposal

NOTICE

Do  NOT  try  to  dismantle  the  system  yourself:  dismantling
of  the  system,  treatment  of  the  refrigerant,  oil  and  other
parts  MUST  comply  with  applicable  legislation.  Units
MUST  be  treated  at  a  specialised  treatment  facility  for
reuse, recycling and recovery.

11

Technical data

▪ A 

subset

  of  the  latest  technical  data  is  available  on  the  regional

Daikin website (publicly accessible).

▪ The 

full  set

  of  latest  technical  data  is  available  on  the  Daikin

Business Portal (authentication required).

Summary of Contents for CVXM20A2V1B

Page 1: ...Installation manual Split system air conditioners English Installation manual Split system air conditioners CVXM20A2V1B FVXM25A2V1B FVXM35A2V1B FVXM50A2V1B...

Page 2: ...ical data 11 11 1 Wiring diagram 12 11 1 1 Unified wiring diagram legend 12 1 About the documentation 1 1 About this document INFORMATION Make sure that the user has the printed documentation and ask...

Page 3: ...ticularly on the high pressure side Do NOT use taped wires stranded conductor wires extension cords or connections from a star system They can cause overheating electrical shock or fire Do NOT install...

Page 4: ...0 mA 4 1 3 Setting the wireless LAN The customer is responsible for providing Smartphone or tablet with minimum supported version of Android or iOS specified on http www onlinecontroller daikineurope...

Page 5: ...trical wiring box cover 1 Open the terminal block 2 Remove 1 screw from the electrical wiring box 3 Unhook the 2 tabs on the electrical wiring box cover and remove it b a c c b a Screw b Wiring box co...

Page 6: ...iping hole location g Left bottom piping hole location h Right bottom piping hole location 6 Temporarily secure the mounting plate on the wall 7 Make sure the mounting plate is level 8 Mark the centre...

Page 7: ...it 44 22 Secure the unit to the extra filler board and to the floor using 6 screws M4 25L field supply 6 23 When the complete installation is finished attach the front panel and the front grille in th...

Page 8: ...extension hose use a polyvinyl adhesive agent for glueing Condensation Take measures against condensation Insulate the complete drain piping in the building To connect the drain piping to the indoor...

Page 9: ...higher than 30 C and the humidity is higher than RH 80 the thickness of the insulation materials should be at least 20 mm to prevent condensation on the surface of the insulation 6 2 Connecting the re...

Page 10: ...Pull the wires to make sure that they are securely attached then retain the wires with the cable clamp 6 Make sure that the wires do not come in contact with the metal parts of the heat exchanger 7 I...

Page 11: ...performed in cooling or heating mode Prerequisite Test run should be performed in accordance with the operation manual of the indoor unit to make sure that all functions and parts are working properl...

Page 12: ...ght emitting diode HAP Light emitting diode service monitor green HIGH VOLTAGE High voltage IES Intelligent eye sensor IPM Intelligent power module K R KCR KFR KHuR K M Magnetic relay L Live Symbol Me...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ...3P477070 2H 2020 06 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...

Reviews: