iom-clic-cf-eng
www.clima-flex.com
110
* The percentage of unbalance of the
power supply must be calculated with
the following formula, and adjusted
with the UNBALANCE command.
Startup and Shutdown Procedures
UNBALANCE PERCENTAGE =
[(MAXIMUM AVERAGE
DEVIATION) / (AVERAGE)] X (100)
DIAGNOSTIC LIGHT INDICATORS (LED STATUS)
Regular operation
Evergreen
Delayed start
Flashing green
Reverse phase
Flashing red
Phase unbalance
Red in lapses
High/low voltage
Constant red
INSPECTION OF THE CONTROL PANEL
Check that the control panel is free of foreign objects.
Power supply unit with three-phase electrical current.
The unbalance phase should be less than 2% of the
average.
Turn on each fan to ensure proper rotation.
Turn on the water pump (if applicable) to make sure it
is running.
After completing the inspection of the above installation points
and ensuring that all elements of the unit are correct, the unit can
be powered up. Turn the switch on the CONTROL UNIT to the ON
position to power the control unit with 24 volts.
START-UP
After powering up the controller, wait 5 minutes for the unit to be
ready to operate.
The operating sequence will begin by checking all pre-
programmed safety points on the unit. If all required conditions
are correct, the unit will be ready to start operations.
UNIT CONTROL
To start operations, turn the ON/OFF switch to the ON position.
After 6 seconds, the control will command the pump to start.
If water flow is detected in the piping, the internal sequence of the
unit will start.
NOTE :
After completing the inspection of the above
installation points and making sure that all elements
of the unit are correct, the unit can be turned on.
Place the switch on the CONTROL UNIT in the ON
position to power the control panel with 24 volts.
NOTE:
The units are factory set, however the power
supply may vary in each installation and due to
this imbalance must be adjusted prior to start-
up in order to protect the motors and electrical
components of all units.
!
WARNING
!
CLIC* units use scroll compressors, which only operate in
one direction, disregarding this point, forcing the compres-
sor to operate in the opposite direction can lead to failure.
ON/OFF
The operating sequence begins with the review of all the pre-
programmed safety points in the equipment control, if the
necessary conditions are met the equipment is ready to start
operation.
To start operation of the unit, turn the ON/OFF switch to the “ON”
position.
After 6 seconds the equipment will command the water pump
to turn on.
If the unit detects flow in the water pipe, the internal control
sequence of this unit will start.
COMPRESSOR
24V
COMPRESSOR
RESET
Set switch APG1, 24V to the on position, then set switch
APG2, Compressor to the on position and finally set
switch APG3, Reset to the on position. switch APG3,
This will start the compressors operating cycle.
Note: Switch APG4 selects the operating mode of the
machine, cooling only or heat pump.
If you want it to operate in heat pump mode activate
the damper.
HEAT-PUMP MODE
COOLING ONLY
MODE
Summary of Contents for Clima-Flex CLIC Series
Page 39: ...iom clic cf eng www clima flex com 39 Electrical Data...
Page 41: ...iom clic cf eng www clima flex com 41 Electrical Data...
Page 43: ...iom clic cf eng www clima flex com 43 Electrical Data...
Page 45: ...iom clic cf eng www clima flex com 45 Electrical Data...
Page 46: ...iom clic cf eng www clima flex com 46 Electrical Data...
Page 48: ...iom clic cf eng www clima flex com 48 Electrical Data...
Page 53: ...iom clic cf eng www clima flex com 53 R454B Electrical Data Figure 38 RS485 communication...
Page 77: ...iom clic cf eng www clima flex com 77 Clic R454b Unit This unit use the R454B Refrigerant...
Page 117: ...iom clic cf eng www clima flex com 117 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 118: ...iom clic cf eng www clima flex com...