9
|
Electrical installation
Installer reference guide
129
ERRA08~12E + EL23E
Daikin Altherma 3 R MT F
4P708478-1 – 2023.05
B
A
B
X5M
3 4 5 6
4
Fix the cable with cable ties to the cable tie mountings.
9.3.5 To connect the domestic hot water pump
Wires: (2+GND)×0.75 mm²
DHW pump output. Maximum load: 2 A (inrush), 230 V AC, 1 A
(continuous)
[9.2.2]
DHW pump
[9.2.3]
DHW pump schedule
1
Open the service cover. See
"7.2.2 To open the outdoor unit"
2
Open the following (see
"7.2.6 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
3
Connect the domestic hot water pump cable to the appropriate terminals as
shown in the illustration below.
A
1~M M2P