![background image](http://html.mh-extra.com/html/daikin/altherma-3-r-ech2o/altherma-3-r-ech2o_installation-and-operating-manual_501184002.webp)
List of contents
Installation and operating manual
2
Daikin Altherma EHS(X/H)(B)-D
Daikin Altherma 3 R ECH
₂
O
008.1451099_00 – 07/2020
List of contents
Particular safety instructions .....................................................
Observing the instructions ..........................................
Meaning of warnings and symbols..............................
Safety instructions for installation and operation.......................
General .......................................................................
Intended use ...............................................................
Installation room..........................................................
Electrical installation ...................................................
Requirements for heating and storage water..............
Heating system and sanitary connection ....................
Operation ....................................................................
Maintenance, troubleshooting and decommissioning ...............
Warranty conditions...................................................................
Design and components............................................................
Function of the 3‑way changeover valves .................................
Dimensions and connection dimensions ...................................
Transport and delivery...............................................................
Installing the heat pump ............................................................
Selecting the installation site....................................... 12
Installing the device .................................................... 13
Preparing the device for installation ..........................................
Remove the front screen............................................. 13
Remove the protective cover ...................................... 14
Moving the switch box to the service position............. 14
Open the switch box ................................................... 14
Removing the bottom thermal insulation..................... 15
Opening the air purge valve........................................ 15
Making the hood opening............................................ 17
Installing the rotary switch of the controller................. 17
Securing the hood....................................................... 17
Installing optional accessories...................................................
Installation of electric backup heater (EKBUxx).......... 18
Installation of the DB connection kit............................ 18
Installation of the P connection kit .............................. 18
Water connection ......................................................................
Minimum water volume ............................................... 19
Connecting hydraulic lines .......................................... 19
Connecting the drain................................................... 20
Electrical connection .................................................................
Overall connection diagram ........................................ 22
Position of the PCBs and terminal strips..................... 23
Mains connection ........................................................ 23
General information on the electrical connection........ 23
Connecting the heat pump outdoor unit...................... 23
External switching contact .......................................... 24
EBA (external requirement request) ........................... 24
Connecting an external heat generator....................... 25
Connecting the room thermostat................................. 26
Connection of optional RoCon system components ... 26
Connecting the HP convector ..................................... 26
Connecting switching contacts (AUX outputs) ............ 27
Low rate mains connection (HT/NT) ........................... 27
Connecting an intelligent controller (Smart Grid - SG)
Connection for refrigerant..........................................................
Laying refrigerant piping ............................................. 28
Pressure test and filling the refrigerant circuit.............. 28
Filling the system........................................................................ 29
Filling hot water heat exchangers ................................ 29
Filling the storage tank................................................. 29
Filling the heating system ............................................ 29
Requirements ............................................................................. 31
Commissioning at low ambient temperatures ............................ 31
Bleeding the hydraulic system.................................................... 31
Checking the minimum flow ....................................................... 32
Start screed drying (only if required) .......................................... 32
Commissioning checklist ............................................................ 32
Handover to the operating company .......................................... 33
Information on the type plate ...................................................... 33
Characteristic lines ..................................................................... 33
Sensor characteristic lines ........................................... 33
Characteristic curves for pumps .................................. 34
Tightening torques...................................................................... 34
Minimum floor area and ventilation openings ............................. 34
Electrical connection diagram .................................................... 36
Piping diagram for refrigerant circuit .......................................... 38
Summary of Contents for Altherma 3 R ECH2O
Page 342: ......
Page 343: ......
Page 344: ...008 1451099_00 07 2020 Copyright Daikin Verantwortung für Energie und Umwelt ...