![Daikin Altherma 3 R ECH2O Installation And Operating Manual Download Page 15](http://html.mh-extra.com/html/daikin/altherma-3-r-ech2o/altherma-3-r-ech2o_installation-and-operating-manual_501184015.webp)
3 Set-up and installation
Installation and operating manual
15
Daikin Altherma EHS(X/H)(B)-D
Daikin Altherma 3 R ECH
₂
O
008.1451099_00 – 07/2020
3‒10 Open the switch box
3
Hook in the cover on the switch box with the lateral hooks.
3‒11 Hooking in the cover
3.4.5
Removing the bottom thermal insulation
CAUTION
The thermal insulation consists of pressure-sensitive EPP
moulded parts that can be easily damaged if not handled
correctly.
▪ Only remove the thermal insulation in the order stated
below and in the stated directions.
▪ Do not use force.
▪ Do not use tools.
1
Remove the thermal insulation in the following order:
▪ Pull the side insulating element off horizontally (item a).
▪ Pull the rear insulating element off horizontally (item b).
▪ Pull the front insulating element off horizontally (item c).
3‒12 Removing the top thermal insulation
a
Side insulating element
b
Rear insulating element
c
Front insulating element
2
As required:
Remove the bottom thermal insulation in the
following order:
▪ Pull the side insulating element off vertically (item a).
▪ Pull the rear insulating element off vertically (item b).
3‒13 Removing the bottom thermal insulation
a
Side insulating element
b
Rear insulating element
INFORMATION
The thermal insulation is installed in reverse order.
3.4.6
Opening the air purge valve
1
Removing the thermal insulation (see
15]).
2
Open the air purge valve on the pump by one turn.
Summary of Contents for Altherma 3 R ECH2O
Page 342: ......
Page 343: ......
Page 344: ...008 1451099_00 07 2020 Copyright Daikin Verantwortung für Energie und Umwelt ...