![background image](http://html.mh-extra.com/html/daikin/4mxs115hv2c/4mxs115hv2c_service-manual_501134021.webp)
Si12-996
Removal of PCBs
Removal Procedure
19
4
Release the hooks and
remove the service
monitor PCB.
5
Remove the 2 screws
of the terminal board
and the earth wire.
6
Remove the 2 screws
of the power supply
terminal.
7
Release the hook on
the right.
Step
Procedure
Points
(R11099)
(R11100)
(R11101)
Earth wire
(R11102)
(R11103)