![background image](http://html.mh-extra.com/html/daikin/4mxs115hv2c/4mxs115hv2c_service-manual_501134017.webp)
Si12-996
Removal of Electrical Box
Removal Procedure
15
4
Disconnect the
connector for fan motor
[S70] and release the
ferrite core attached to
the electrical box with
clamp.
When reassembling, insert
the clamp into the hole.
5
The illustration shows
arrangement of the fan
motor lead wire.
Fix the ferrite core at where
the tension does not pull the
PCB ASSY when connecting
the connectors.
6
Disconnect the 4
connectors for
electronic expansion
valve coil and detach
the clamp.
[S20]: room A (blue)
[S21]: room B (yellow)
[S22]: room C (white)
[S23]: room D (red)
When reassembling, insert
the clamp into the hole.
7
Disconnect the
connector for four way
valve coil [S80].
Step
Procedure
Points
[S70]
Ferrite core
(R11082)
(R11083)
Fixing position for ferrite
core of fan motor
(R11084)
Fan motor lead wire
[S20] [S21] [S22] [S23]
(R11085)
(R11086)
Fixing position for
electronic expansion valve
coil connectors
(R11087)
[S80]