![background image](http://html.mh-extra.com/html/daikin/4mxs115hv2c/4mxs115hv2c_service-manual_501134020.webp)
Removal of PCBs
Si12-996
18
Removal Procedure
4. Removal of PCBs
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the electrical
box.
1. Removal of the PCB
1
Turn over the insulation
sheet.
Peel off the filament
tape.
2
Unhook the 4 hooks
and remove the
electrical box cover.
3
Disconnect the
connectors [S52]
[S102] from the service
monitor PCB.
(R11096)
Insulation sheet
Filament type
(R11097)
Electrical box cover
[S102]
(R11098)
[S52]
Service
monitor
PCB