SiBE121135
Trial Operation
Trial Operation and Field Settings
411
BRC1E51A7
Step
Action
Remote controller
Before test operation
1
Turn on the power supply more than 6 hours
before test operation.
2
Open the gas stop valve.
3
Open the liquid stop valve.
How to activate test operation
4
Press and hold the [Cancel] button (
) for
4 seconds to enter the
Field setting
menu.
5
Use the
buttons to select
Test
operation ON/OFF
and push the [Menu/
Enter] button (
).
6
Test operation
is displayed on the bottom of
the basic screen.
7
Push the [ON/OFF] button (
) within 10
seconds to start the test operation.
How to check airflow direction
8
Push the [Menu/Enter] button (
) to enter
the
Main Menu
.
9
Use the
buttons to select
Airflow
direction
and push the [Menu/Enter] button
(
).
10
Check that the airflow direction is actuated
according to the setting and push the [Menu/
Enter] button (
) .
How to deactivate test operation
11
Press and hold the [Cancel] button (
) for
4 seconds to enter the
Field setting
menu.
12
Use the
buttons to select
Test
operation ON/OFF
in the menu and push the
[Menu/Enter] button (
).
(R12872)
(R12873)
(R12874)
(R12875)
(R12876)