23
1.
Now, we will continue going down the array,
resting it on the platform. When the four lower
boxes are resting, we shall proceed to remove the
security pins, as shown in the following figures.
3.- We shall lift the rest of
the array a little and we shall
draw this group of boxes
from under the top group,
then we shall fold the front
rods acting on the front
trigger, we will remove the
security pins of SELECT
ANGLE holes and we will
move the handles to STORE
position (folding the rear
rods).
2.- Then we shall remove
the front security pins.
To d i s a s s e m b l e t h e
remaining enclosures, we shall
proceed as with the first group.
1.- We shall remove the
security pins of the REAR
LINK holes of the upper box.
DETAILS
3.
2.
Manual de Colgado
/ aero series /
Rigging Manual