2: BladeManager Installation
2-10
AlterPath BladeManager Manual
a. Before you transport the rack cabinet to another location with the
BladeManager installed, you must secure the server to the rack. If
necessary, disconnect the cables from the rear of the server; then,
slide the server out of the rack 150 mm (6 in.) and insert the M6
screws in each slide rail.
b. Secure the server or the rack cabinet with the M6 screws.
c. Ensure the rails are fully extended to the rear of the rack cabinet and
that the shipping brackets are installed.
d. Go to steps 4, 5, and 6 for instructions.
Summary of Contents for AlterPath BladeManager
Page 10: ...Table of Contents VIII AlterPath BladeManager Manual...
Page 16: ...Before You Begin vi AlterPath BladeManager Manual...
Page 24: ...1 Introduction 1 8 AlterPath BladeManager Manual...
Page 54: ...2 BladeManager Installation 2 30 AlterPath BladeManager Manual...
Page 162: ...4 BladeManager Web Administration 4 80 AlterPath BladeManager Manual...
Page 186: ...5 Advanced Configuration 5 24 Alterpath BladeManager Manual...
Page 202: ...A BladeManager Hardware Specifications A 4 AlterPath BladeManager Manual...