2: BladeManager Installation
2-6
AlterPath BladeManager Manual
a. If you plan to transport the rack cabinet to another location with the
server installed, remove one screw and loosen the other screws as
indicated.
b. Fully extend the rail and re-insert the screw and tighten all screws to
secure the rail.
c. If you do not plan to transport the rack cabinet with to another
location with the server installed, continue with step 5.
Summary of Contents for AlterPath BladeManager
Page 10: ...Table of Contents VIII AlterPath BladeManager Manual...
Page 16: ...Before You Begin vi AlterPath BladeManager Manual...
Page 24: ...1 Introduction 1 8 AlterPath BladeManager Manual...
Page 54: ...2 BladeManager Installation 2 30 AlterPath BladeManager Manual...
Page 162: ...4 BladeManager Web Administration 4 80 AlterPath BladeManager Manual...
Page 186: ...5 Advanced Configuration 5 24 Alterpath BladeManager Manual...
Page 202: ...A BladeManager Hardware Specifications A 4 AlterPath BladeManager Manual...