17
Before
connecting any pipes to the appliance, fully purge pipes of debris or swarf
etc. and connect the gas supply to the 8mm isolation valve on the fire. Leak test
the supply using an approved method.
After the gas and electrics have been positioned the recessed plate is to be fixed in
place via the holes provided at each end of the recessed plate. Ensure that the
plate is securely attached with the gas; electric supply and switch cables safely
routed through.
Summary of Contents for Flueless Fire Pod
Page 5: ...5 4 2 Parts List...
Page 6: ...6 4 3 Overall Dimensions Dimensions of Fire Unit with Metal Fascia...
Page 7: ...7 Dimensions of Fire Unit with Stone Fascia...
Page 15: ...15 The Remote Controls Black Box left Controls Valve Right...
Page 18: ...18 Pod Gas Inlet electric supply and hardwire switch cable areas...
Page 22: ...22 4 7 Remote Wiring Diagram...