![CUSTOM TRUCK LOAD KING 25-92 Installation Manual Download Page 92](http://html1.mh-extra.com/html/custom-truck/load-king-25-92/load-king-25-92_installation-manual_2700930092.webp)
TABLE OF CONTENTS
Introduction .............................................................................................................................. 3
1.1 Overview and Preparation .................................................................................................. 3
2.1 System Self-Test ............................................................................................................... 4
2.2 Display Console Problems ................................................................................................. 5
2.3 Fault Reporting and Fault Codes ....................................................................................... 6
2.3.1 Group “A” Fault Codes .............................................................................................. 7
2.3.2 Group “B” Fault Codes .............................................................................................. 7
2.3.3 Group “C” Fault Codes .............................................................................................. 8
2.3.4 Group “D” Fault Codes .............................................................................................. 8
2.4 “No Fault Code” Problems ................................................................................................. 9
2.4.1 Anti-Two-Block Alarm (ATB)...................................................................................... 9
2.4.2 Displayed Load or Radius Errors ............................................................................... 9
3.1 Computer Unit Overview .................................................................................................. 12
3.2 Computer Unit Layout ................................................................................................ 12
3.3 Internal Status Indicators ............................................................................................ 13
3.4 Function Kickout Fuse (FUS1) ................................................................................... 14
3.5 Replacing the Computer Unit ..................................................................................... 14
4.1 Display Console Overview ............................................................................................... 15
4.2 Checking the Display Console.................................................................................... 15
4.3 Unresponsive Buttons ................................................................................................ 15
4.4 Connectors................................................................................................................. 16
4.5 Horn ........................................................................................................................... 16
4.6 Moisture ..................................................................................................................... 16
4.7 Replacing the Display Console................................................................................... 17
5.1 Calibration Mode .............................................................................................................. 18
5.2 Entering the Calibration Mode .................................................................................... 19
5.3 Calibration Menus ...................................................................................................... 20
5.4 Calibrating the Extension Zero ................................................................................... 22
5.5 Calibrating the Angle Sensor Zero ............................................................................. 23
5.6 Calibrating Span of Extension and Angle ................................................................... 24
5.7 Calibrating the Swing Potentiometer .......................................................................... 26
5.7.1 Calibrating Swing Direction................................................................................ 26
5.7.2 Cranes with Swing Switches .............................................................................. 27
5.8 Calibrating the Outrigger Position Sensor .................................................................. 28
5.9 After the Calibration Routine ...................................................................................... 30
6.1 Reeling Drum Overview ................................................................................................... 31
6.2 Checking the Reeling Drum Cable Layering ............................................................... 32
6.3 Sensor Baseplate Assembly ...................................................................................... 33
6.4 Anti-Two-Block Function Overview ............................................................................. 35
6.5 Checking the Reeling Drum Cable ............................................................................. 35
6.6 Checking the Anti-Two-Block Circuit .......................................................................... 35
7.1 WAD/ISS ......................................................................................................................... 37
7.2 WAD/ISS Troubleshooting Table ................................................................................ 38
7.3 Replacing the Swing Sensor ...................................................................................... 39
7.4 Replacing the Conditioning Box ................................................................................. 40
Summary of Contents for LOAD KING 25-92
Page 1: ...INSTALLATION MANUAL LOAD KING 25 92 MARCH 16 2020...
Page 2: ...This page left intentionally blank...
Page 4: ...This page left intentionally blank...
Page 7: ...This page left intentionally blank...
Page 21: ...Pages 2 11...
Page 24: ......
Page 64: ...Load King Operation Manual SECTION 7...
Page 91: ...Load King Operation Manual GREER INSIGHT OPERATION MANUAL...
Page 124: ......
Page 126: ......
Page 133: ...This page left intentionally blank...
Page 135: ...DWG NO B SHEET 2 OF 2 SCALE NONE REV SIZE D 35 TON...
Page 147: ...SIZE 2 REV 1 D 3 A C SCALE 1 1 SHEET 2 OF 2 A B DWG NO 5 C 2 D D 7 8 B 3 8 6 7 5 4 4 6 1 E...
Page 153: ...DWG NO B SHEET 2 OF 4 SCALE 1 2 REV SIZE F...
Page 154: ...DWG NO B SHEET 3 OF 4 SCALE 1 2 REV SIZE F...
Page 155: ...DWG NO B SHEET 4 OF 4 SCALE 1 2 REV SIZE F...
Page 157: ...DWG NO B SHEET 2 OF 4 SCALE 1 2 REV SIZE F...
Page 158: ...DWG NO B SHEET 3 OF 4 SCALE 1 2 REV SIZE F...
Page 159: ...DWG NO B SHEET 4 OF 4 SCALE 1 2 REV SIZE F...
Page 162: ...DWG NO B SHEET 2 OF 3 SCALE REV SIZE A...
Page 163: ...DWG NO B SHEET 3 OF 3 SCALE REV SIZE A...
Page 165: ...C A 1 2 SHEET 2 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 166: ...C A 1 2 SHEET 3 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 167: ...C A 1 2 SHEET 4 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 168: ...C A 1 2 SHEET 5 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 169: ...C A 1 2 SHEET 6 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 170: ...C A 1 2 SHEET 7 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 171: ...C A 1 2 SHEET 8 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...