INSTALLATION REQUIREMENTS
Page 2 - 2
The installer is the first party to operate the complete machine. Installers are responsible for
validation of the machine and that it operates properly. While
Load King
cycles the boom and
main-frame assemblies at the factory, some additional work may be required once the
machine is operational.
During PTO and pump installation it is critical that the installer makes sure they have the right
rotation components to match the chassis. Incorrect rotation of the pump will result in little or no
oil flow and will likely cause pump failure. For detailed information on proper PTO and pump
installation see Section 2-
5
: PTO Selection, and Section 3-1: Hydraulic Pump Installation.
Once the boom has been cycled on the machine the boom assembly will require additional
adjustments which include but are not limited to:
• extend and retract cable adjustments
• pad alignment adjustments
For machines with jib options: the jib must be adjusted on a completed machine after the boom
has been cycled and the machine tested to ensure that all air is removed from the boom
extend cylinder. This adjustment will include the jib brackets and boom cables to get the jib to
pin to the boom head and stow properly. For detailed information on jib installation, see Section
3-
28
: Erecting the Jib, and Section 3-
31
: Stowing the Jib.
Relief valve pressures have been factory preset. The installer should do quick pressure checks
on the machine. Section
5
has good information on pressures, both validation and adjustment.
If you have any questions with installation or need help please contact
Load King
at
855-548-2336
.
INSTALLER RESPONSIBILITIES
Summary of Contents for LOAD KING 25-92
Page 1: ...INSTALLATION MANUAL LOAD KING 25 92 MARCH 16 2020...
Page 2: ...This page left intentionally blank...
Page 4: ...This page left intentionally blank...
Page 7: ...This page left intentionally blank...
Page 21: ...Pages 2 11...
Page 24: ......
Page 64: ...Load King Operation Manual SECTION 7...
Page 91: ...Load King Operation Manual GREER INSIGHT OPERATION MANUAL...
Page 124: ......
Page 126: ......
Page 133: ...This page left intentionally blank...
Page 135: ...DWG NO B SHEET 2 OF 2 SCALE NONE REV SIZE D 35 TON...
Page 147: ...SIZE 2 REV 1 D 3 A C SCALE 1 1 SHEET 2 OF 2 A B DWG NO 5 C 2 D D 7 8 B 3 8 6 7 5 4 4 6 1 E...
Page 153: ...DWG NO B SHEET 2 OF 4 SCALE 1 2 REV SIZE F...
Page 154: ...DWG NO B SHEET 3 OF 4 SCALE 1 2 REV SIZE F...
Page 155: ...DWG NO B SHEET 4 OF 4 SCALE 1 2 REV SIZE F...
Page 157: ...DWG NO B SHEET 2 OF 4 SCALE 1 2 REV SIZE F...
Page 158: ...DWG NO B SHEET 3 OF 4 SCALE 1 2 REV SIZE F...
Page 159: ...DWG NO B SHEET 4 OF 4 SCALE 1 2 REV SIZE F...
Page 162: ...DWG NO B SHEET 2 OF 3 SCALE REV SIZE A...
Page 163: ...DWG NO B SHEET 3 OF 3 SCALE REV SIZE A...
Page 165: ...C A 1 2 SHEET 2 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 166: ...C A 1 2 SHEET 3 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 167: ...C A 1 2 SHEET 4 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 168: ...C A 1 2 SHEET 5 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 169: ...C A 1 2 SHEET 6 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 170: ...C A 1 2 SHEET 7 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Page 171: ...C A 1 2 SHEET 8 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...