
3
18
CUES Inc.
,
PICS User Manual | CH915
www.cuesinc.com
,
SET-UP & INSTALLATION
CONNECTING THE COILER TO THE PCU -
The coiler and AC connections are located on the
side of the control unit.
Attach the interconnect cable, P/N CH070, from the
coiler to the control unit as shown.
Connect the AC power cord to the control unit
as shown.
Confirm the Battery “Charging” Yellow Light or
“Charged” Green Light indication appears on
control unit.