11
Installation -
Tiled Roof
STEP 6
Fold and form the front
edge of the flashing to
seal against the tiles
below.
Using a soft hammer,
carefully dress the front
and sides of the flashing
into the shape of the tiles.
For BAL installs this
must be done with care
to ensure that no gaps
greater than
2mm
are
present.
SOFT
HAMMER
STEP 7 - NON BAL ONLY
To assist with
weatherproofing a bead of
silicone sealant can be
applied between the tiles
and the side and front
edges of the flashing.
THIS SHOULD NOT BE
DONE FOR BAL ZONE
INSTALLATIONS DUE
TO THE COMBUSTIBLE
NATURE OF SEALANTS.
Summary of Contents for Bradford Maestro BAL
Page 1: ...Product Manual ...
Page 3: ...3 4 1 2 3 ...
Page 25: ...25 Notes ...
Page 26: ...26 Notes ...
Page 27: ...bradfordventilation com au ...