HV Breakout Module – Mounting and installation
Installation Manual
11
Version 01.20 // 2021
NOTE!
i
Strong magnetic fields, such as those induced by permanent magnets,
may impair the trouble-free operation of the measurement module.
"
Never attach the measurement module to a permanent magnet.
Requirements
f
The ventilation openings of the GORE™ membrane must not be blocked or clogged by
mounting at the intended position.
f
Select a mounting position that ensures the ventilation openings are not permanently
submerged in any liquid.
f
The mounting position must offer sufficient space to connect and disconnect the cables
without kinking or clamping them.
f
Avoid mounting positions in which the modules are subjected to continuous strong vibra-
tions and/or shocks.
Parts/material required
f
four M4 screws
3
f
a suitable screwdriver or wrench
Mounting the measurement module
"
Fasten the measurement module at the mounting position.
i
Please contact our support for the appropriate drill hole diagrams.
NOTE!
i
Making mechanical modifications to the housing, such as by drilling
additional holes, can impair the function of the measurement module or
destroy it. Additionally this would invalidate the warranty.
"
Never drill additional holes in the housing.
"
Observe mounting instructions.
3 The thread depth in the module housing is 6 mm. The screw length must be chosen according to the thickness of the mounting
material.