
37
code 6118250 iss. 10-2018
2
Turn the thermal circuit breaker ON.
2
SE
T
3
9.2 Commissioning
Once the installation has been
completed and all the above has been
checked, the system can be started
for the first time. Only a CSTHERMOS
authorized engineer can do this,
also informing the customer on the
operations to carry out to make the
stove work correctly.
1
Fill the stove container with pellets.
1
4
Switch the stove ON using the button on the control panel.