-
7
-
3. Stock advice for R32 models
The warehouse should be bright, spacious, open, well ventilated, have ventilation
equipment and no fire source.
*VERY IMPORTANT* Heat pumps must be stored and transferred in a vertical position in its
original packaging. If this is not the case, the heat pump cannot be operated until a
minimum period of 24hrs has passed with the unit upright, before the unit can have the
electrical power turned on.
Smoking and the use of flames are prohibited near R32machine.
Water connections are not to be used as load bearing handles. The manufacturer does not accept
"ANY" responsibility for "ANY" damage to the water pipes.
4. Installation
4.1 Accessories list
Anti-vibration base, 4 pcs
Draining plug, 2 pcs
Water drainage pipes, 2 pcs
Winter Cover, 1 pc
Water connection assembly, 4 sets
(
2 sets 48.3mm, 2 sets 50mm )
Summary of Contents for CHP075PX
Page 1: ......
Page 2: ...Please read and understand ALL the instructions before installation and use...
Page 6: ...4 2 Dimension unit mm 2 1 Model CHP075PX CHP095PX...
Page 7: ...5 2 2 Model CHP115PX CHP135PX CHP165PX 2 3 Model CHP205PX CHP255PX...
Page 8: ...6 2 4 Model CHP305PX...
Page 11: ...9 Dry contact timer connection Timer Dry contact pump connection Water pump...
Page 32: ...30 10 Exploded view 10 1 Model CHP075PX CHP095PX...
Page 34: ...32 10 2 Model CHP115PX CHP135PX CHP165PX...
Page 36: ...34 10 3 Model CHP205PX CHP255PX...
Page 38: ...36 10 4 Model CHP305PX...
Page 42: ...40...
Page 44: ...42...
Page 45: ...43 4 Parameter checking and setting Click Parameter then enter the password 0757...
Page 47: ...45...
Page 50: ......
Page 51: ...A0211MPX02...