User’s Manual for SM5C Straight Line Glass Edging Machine   

(866) 583-1377    Sommer & Maca Machinery Division of C. R. Laurence Co.    •    crlaurence.com    •    (800) 421-6144 

 
2.  Turn  on  the  Main  Electrical  Disconnect  Switch  (8)  on  the  left  side  of  the  control  panel. 

Voltmeter (7) indicates the power source voltage, check that the voltage is within specified range; 
turn on Power Source Switch with Indicator Light (1). All other power should be off. 

3. Put a piece of glass that is long enough to occupy Pos.1-Pos.5 wheel on the input conveyor. 

Set  the  Conveyor  Direction  Switch  (11)  to  the  glass  working  direction  (right  to  left),  Activate 
Conveyor  Transmission  Switch  (10),  the  glass  should  start  moving.  Stop  Conveyor  Transmission 
Switch (10) or Emergency Switch (9) when the front of the glass passes the Pos. 4 wheel. 

4.  Turn  the  hand-wheel  of  Pos.1-Pos.5  spindles  clockwise  to  move  the  wheels  toward  the 

grinding  position  until  the  wheel  touches  the  glass  (manually  turning  the  wheels  during  spindle 
adjustment will help you hear the wheel touch the glass). Record the indicator’s position and then 
turn the hand-wheel of the spindles anti-clockwise to move the wheels away from the glass grinding 
position.   

5. Restart Conveyor Transmission Switch (10), when the glass leaves the main machine to the 

output conveyor, stop Conveyor, Switch (10) or Emergency Switch (9). 

6. Turn the hand-wheel of Pos.1-Pos.5 spindles clockwise to move the wheels towards the glass 

grinding position back to the above-mentioned adjustment position that you recorded. 

Grinding Testing 

1

Now  all  the  wheels  are  at  Zero  grinding  position.  You  can  now  adjust  the  wheel  position 

according  to  the  grinding  amount  desired.  In  normal  operation,  Pos.1  grinds  about  1/32”  of  the 
flat-edge grinding amount. Always test with the Water Pumps running! 

2. Adjust the arris wheels in so they grind the desired amount of seam. Generally keep this to a 

small amount of grinding. 

3. Slowly adjust the No.4 polish wheel up to achieve the best quality polish.   
4. Adjust the No. 5 polish wheel up to give the best final luster, start Water Pump Switch (15), 

check the coolant flow and start the Motor Switches (14), start Conveyor Transmission Switch (10). 

5. Put the glass that was used for adjusting the wheel position on the input conveyor. Adjust the 

wheel grind position according to the indication on the Grinding Motor Ampere Meter (2).   

Quantity grinding 

1.  After  several  test  runs,  all  the  wheels  are  in  the  best  grinding  position.  Now  you  can  start 

quantity grinding. 

2. Add about 1/2 pound of synthetic diamond coolant (Cat No. 2651005) to the 45 gallon tank of 

clean water and start Water Pumps, Switch (15), and check that the coolant is flowing to the wheels. 
Start  the  Motors  (Switches  12-13-14),  start  Conveyor  Transmission  Switch  (10).  Adjust  the 
transmission speed according to the glass thickness and grinding amount. Put the glass on the input 
conveyor. 

3.  Watch  the  indication  on  the  Grinding  Motor  Ampere  Meter  (2)  and  make  up  the  loss  of 

wheels  if  it  is  necessary  especially  on  the  polishing  wheel.  Lower  Amp  readings  indicate  less 
contact with the wheel and therefore the wheel can be adjusted closer to the glass. 

 

Summary of Contents for SM5C

Page 1: ......

Page 2: ...parts list and diagrams in back of this manual 3 Position Machine Body in place see Fig 7 14 4 Install leveling feet on main Body and adjust for level page 6 5 Install and level ingoing conveyor see F...

Page 3: ...S MANUFACTURE SELLER S LIABILITY TO BUYER HEREUNDER IS LIMITED TO SUCH WARRANTY AS THE MANUFACTURER MAKES TO SELLER BUT IN NO CASE GREATER THAN 12 MONTHS FROM DATE OF SHIPMENT BY SELLER LIMITATION OF...

Page 4: ...s in this manual and to regularly follow procedures of maintenance which will allow you to obtain a higher degree of reliability safety and durability of the product This manual contains several advis...

Page 5: ...area clean and orderly as unorganized work areas encourage accidents Before starting verify the condition of the machine Check the standard operation and for broken and or damaged parts Replace all br...

Page 6: ...angle 45 Max arris width 2 5mm 3 32inch Max grinding amount of flat edge 2 5mm 3 32inch 4 Height of input conveyor 850mm 33 5inch 5 Glass feeding speed 0 5 3 0m min 20 120inch min 6 Overall dimension...

Page 7: ...guard Raise the low side by turning the square bolt heads clockwise until the machine is level side to side Now adjust the rear feet to maintain a 5 degree tilt back This is the standard angle to keep...

Page 8: ...r Source Switch with Indicator Light 2 Grinding Motor Ampere Meters 3 Arris Seam Motor Ampere Meters 2 4 Polish Motor Ampere Meters 2 5 Motor Overload Indicator Light 6 Conveyor Ampere Meter 7 Voltage...

Page 9: ...tioned adjustment position that you recorded Grinding Testing 1 Now all the wheels are at Zero grinding position You can now adjust the wheel position according to the grinding amount desired In norma...

Page 10: ...middle of the oil gauge or have the box full 4 Grease the bearings gears and sprockets of the right and left gearbox every 3 or 4 months of operating 5 Change the water in the coolant tank periodicall...

Page 11: ...ear etc 03 SE5M F2 Output Conveyor 1 With wooden gear etc 04 38 1 XH4289 425 2mm PU Timing Belt 2 05 SE5M F10 Pull Rod 2 06 SE5M F11 Middle Pillar 2 07 SE5M F12 Rack Pillar 2 08 2145mm Roller Strip 4...

Page 12: ...Box List Tools No Item Description Qty Remark 01 Tool Box 1 02 S 10 14 17 19 24 Sockets Each 1 03 250mm Ratchet Handle 1 04 250mm Long Extension 1 05 125mm Short Extension 1 06 S 10 14 17 19 24 Combo...

Page 13: ...LIARY CONTACTOR 1 47013271 OVERLOAD RELAY 3US5040 1J 1 47013272 OVERLOAD RELAY 1 0 1 6A 1 47013273 OVERLOAD RELAY 4 0 6 3A 1 47013274 FUSE 6A 1 47013275 INDICATOR LAMP G23 1 47013276 BUTTON SWITCH E S...

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...ls Annex to User Manual The following assembly details will be of help when assembling the SM5C June 2011 Some construction details may have changed since the photos were taken but the assembly method...

Page 29: ...th 83 2108 mm A black rubber roller is at the out side end of each conveyor Remove the wooden conveyor covers The vertical supports are the same for either side of the machine They will require two sh...

Page 30: ...l run straight into and out of the machine Level the conveyors with the outer bolts as shown in figure L Also see Figure 10 in the manual Now the Pull Rods can be hand tightened Install the timing bel...

Page 31: ...utgoing left side 2 78 1981 mm top or middle 1 73 1854 mm bottom Attachment bolts will need to be slid into the tracks on the back side Place 2 of the 3 1 8 79 mm plated bolts Figure S in each lower r...

Page 32: ...you After connecting the power supply have the electrician check for proper voltage indicated on the Volt Meter on the control panel and check the operation of the coolant pump as follows Be sure the...

Reviews: