Remove the lifting hooks and fit the
glass rack uprights with the same bolts.
Fit the 4 short glass rack supports as
shown in figure P on the back side of the
conveyors, two per side. The black allen
socket head bolts are for alignment.
Locate the 6 lower glass rails. There is a
blue wedge end inserted into one end of
each rail. Figure R. The blue wedge
ends face into the main conveyor of the
machine. The lower rails are somewhat
adjustable side to side.
3 rails for ingoing (right) side:
1-73" (1854 mm) top or middle
1-75" (1905 mm) top or middle
1-70" (1778 mm) bottom
3 rails for outgoing (left) side:
2-78" (1981 mm) top or middle
1-73" (1854 mm) bottom
Attachment bolts will need to be slid into
the tracks on the back side. Place 2 of
the 3-1/8" (79 mm) plated bolts
(Figure S) in each lower rail.
The 12 upper glass rails can now be
installed. Each will require 2 plated 5/8"
(16 mm) bolts to be inserted. There are
3 different length rails. Refer to Figure T
for position. There are 4 of each length.
Attach each upper rail from the back by
using angle brackets and a through bolt
with washer and nut. Figures U and V.
Sight down the glass rails and check for
conveyor alignment.
Check the machine and conveyors for
level and tighten all bolts and fasteners.
Travel
88"
2235 mm
56.5"
1435 mm
84"
2133 mm
Figure M
Figure N
Figure P
Figure T
Figure R
Figure S
Figure U
Figure V