SM5C ASSEMBLY STEPS
Start by moving the main base of the
machine off of the skid and into the
location where it will be used.
This will be easiest with a fork lift or
overhead crane. Lifting hooks are
attached to the top of the machine.
A level location is important.
Level the base of the machine with 6 of
the shock absorbing feet provided. Refer
to the main manual for installation of
these. (Page 6, section 1, item 3)
Locate the 2 white timing belts and feed
them into the timing pulleys as shown.
The belts will have to be put in “on-edge”
to get them around the front
of the pulleys. Figure A.
Locate the right and left glass conveyors
and their upright supports. Each
conveyor is the same length, 83” (2108
mm). A black rubber roller is at the out-
side end of each conveyor. Remove the
wooden conveyor covers.
The vertical supports are the same for
either side of the machine. They will
require two shock absorber feet each.
Support the outside end of the
ingoing
conveyor with a stand or jack and set the
inside end on the attachment block (B).
Keep the belt up out of the way, with the
lower belt section fitting into the bottom
of the conveyor channel as shown.
(Figure C). Secure the ingoing conveyor
with the long bolt (Figure D and E).
Place a vertical support under the outside
end of the conveyor. Secure it with the
long bolt and thick flat washer.
Figure F and G. (next page)
Read the Manual for the Machine Before Following These Steps to Assemble the SM5C
Figure A
Figure C
Figure D
Figure E
ATTACHMENT BLOCK B
ATTACHMENT BLOCK B
Hardware is shown on a 1" (25 mm)
grid with 1/8" (3.1 mm) divisions.