![CRL SM5C User Manual Download Page 32](http://html1.mh-extra.com/html/crl/sm5c/sm5c_user-manual_2686769032.webp)
Place the coolant tank under the Right
Side, In-going conveyor. Figures W1,
W2
Place the coolant pump into the tank
and connect the coolant supply hoses
to the coolant manifold on the back of
the machine, Figure W3. Attach the
white PVC drain pipe to the back of the
machine with the large Tie-Wraps,
Figure W3, and connect the gray drain
hoses to it. Figures W1, W2
Plug the coolant pump power cable into
the socket on the side of the machine
near the power connection box.
Figure Y.
Refer to page 6, section 1, item 4, in
the manual and connect power to the
machine. 3 Phase, 60 Hz, 230V AC -
US version.
You may want to have an electrician
do this work for you.
After connecting the power supply, have
the electrician check for proper voltage
indicated on the Volt Meter on the control
panel and check the operation of the
coolant pump as follows:
Be sure the coolant pump lines and
drains are connected and the coolant
tank is full.
Turn on the machine power and run the
pump (only) for a few seconds and
check for water at the wheels. A good
supply of water spray should be visible.
If no water is pumped to the wheels,
the pump may be running backwards
and the supply wiring may need to be
reversed.
Figure W1
Figure W2
Figure Y
Central Oiler:
Fill with light (SAE 10 wt.) oil
and pump to lubricate conveyor
chain sliders. (see page 10,
sec. 6, in Main Manual)
Spindle Slides:
Lubricate where shown with
light (SAE 10 wt.) oil. (see page
10, sec. 6, in Main Manual)
General Maintenance Oiling (See Page 9 in Manual)
Figure W3